Power networks/Spain

From OpenStreetMap Wiki
Jump to navigation Jump to search


Country Information
Spain (ES)
Spain flag

References
OpenStreetMaprelation 1311341
WikidataQ29
WikipédiaSpain
Country characteristics
ContinentEurope
Population48,592,909
Area505,990 km2
GDP1397.5 B$
Language(s)Spanish
Electrical Network
Generation capacity89,405 MW (OSM)
Power line length117,674 km (OSM)
Frequency... Hz
Transmission lines voltages (kV)12 - 13 - 13.2 - 15 - 17 - 20 - 22 - 24 - 25 - 30 - 33 - 35 - 45 - 50 - 55 - 60 - 65 - 66 - 66.6 - 100 - 110 - 120 - 130 - 132 - 138 - 150 - 200 - 220 - 225 - 240 - 250 - 320 - 400
Data from Wikidata (last update 2025-09-13)
and OpenInfraMap (last update 2025-09-13)

This page has been created through the power networks country page template. Check the template page for more information on how to complete it.

High-voltage Electrical Network

State of the map

TODO : Take a JOSM screenshot of the country current power network. More info in power networks country page template

Network description

Voltages and frequency

Frequency : TODO Hz

Network Voltage Comments Appearance
Transmission 12000
Transmission 13000
Transmission 13200
Transmission 15000
Transmission 17000
Transmission 20000
Transmission 22000
Transmission 24000
Transmission 25000
Transmission 30000
Transmission 33000
Transmission 35000
Transmission 45000
Transmission 50000
Transmission 55000
Transmission 60000
Transmission 65000
Transmission 66000
Transmission 66600
Transmission 100000
Transmission 110000
Transmission 120000
Transmission 130000
Transmission 132000
Transmission 138000
Transmission 150000
Transmission 200000
Transmission 220000
Transmission 225000
Transmission 240000
Transmission 250000
Transmission 320000
Transmission 400000

These values are used for quality control in some OSM tools. If you change them, please also report it by creating an issue on GitHub. More information about country voltage QA.

Operators

Operator Network Wikidata Website Wikipedia Operating area Information Label Taginfo
TODO {{{network}}} Q99999
WhatLinksHere
TODO TODO operator=TODO
operator:wikidata=Q99999
operator=TODO

Interconnections

Neighbour country Structure name Year of commissioning Technology Voltage Local end Foreign end OSM circuit Notes
TODO xxx

Planned projects

  • ...

Data Sources

Source License Date Suitable for OSM Notes
Edistribucion - Capacity access at network nodes ? ? ? -
REE Map of Substations ? ? ? -


Network statistics

Spain has 4278 power plants totalling 89,405 MW and 117,674 km of power lines mapped on OpenStreetMap (from OpenInfraMap, last update 2025-09-13)


Power line

From Official Sources (last update 2025-10-21)
Power Lines Voltage Length Circuit or Line Source Date
132kv 3009 km Circuit https://www.ree.es/es/datos/transporte 2025
220kv 20416 km Circuit https://www.ree.es/es/datos/transporte 2025
400kv 22289 km Circuit https://www.ree.es/es/datos/transporte 2025
Total 45804 km Circuit https://www.ree.es/es/datos/transporte 2025

ATTENTION: These numbers only include the length run by Red Eléctrica (RE) the TSO of Spain. However, many DSO's also run 132kv so the length given for 132kv is only a small fraction of the national number.

Power Lines Voltage Length
From OpenInfraMap, last update 2025-09-13
< 10 kV 123 km
10 kV - 25 kV 10,495 km
25 kV - 52 kV 12,282 km
52 kV - 132 kV 15,603 km
132 kV - 220 kV 16,760 km
220 kV - 330 kV 15,792 km
330 kV - 550 kV 14,941 km
> 550 kV 0 km
No voltage tagged 31,674 km
Total 117,674 km


Electricity generation

Mapping process and community

Mapping success stories

TODO : Success stories are designed to highlight important contributions. Have you significantly improved the cartography of a country (added a new line, a power station, etc.)? Don't be shy, let us know below.

  • Example : NAME [DATE YYYY-MM-DD]: My success stories in words.

Encountered problems and places to improve

  • ....

Use of mapping strategies

TODO : Mapping strategies refer to Power networks/Guidelines#Mapping strategies. They are used for a methodical improvement of the OSM database. Once you have fully applied a strategy in this country, you should add or update your name, the date, the strategy, and a comment below. This way, other users can see whether it is worthwhile to carry out further investigations.

  • Example : Search for "Unfinished major power lines" - last time applied by XXX [2025-MM-DD]
  • .... - last time applied by XXX [2025-MM-DD]

References