Power networks/Morocco
| Morocco (MA) | |
|---|---|
| References | |
| OpenStreetMap | 3630439 |
| Wikidata | Q1028 |
| Wikipédia | Morocco |
| Country characteristics | |
| Continent | Africa |
| Population | 36,828,330 |
| Area | 446,550 km2 |
| GDP | 134.2 B$ |
| Language(s) | Arabic, Standard Moroccan Amazigh |
| Electrical Network | |
| Generation capacity | 11,410 MW (OSM) |
| Power line length | 37,152 km (OSM) |
| Frequency | ... Hz |
| Transmission lines voltages (kV) | 20 - 22 - 22.5 - 30 - 33 - 60 - 110 - 132 - 150 - 220 - 225 - 400 |
| Data from Wikidata (last update 2025-09-13) and OpenInfraMap (last update 2025-09-13) | |
This page has been created through the power networks country page template. Check the template page for more information on how to complete it.
High-voltage Electrical Network
State of the map
In 2025-04:
Network description
Voltages and frequency
Frequency : TODO Hz
| Network | Voltage | Comments | Appearance |
|---|---|---|---|
| Transmission | 20000 | ||
| Transmission | 22000 | ||
| Transmission | 22500 | ||
| Transmission | 30000 | ||
| Transmission | 33000 | ||
| Transmission | 60000 | ||
| Transmission | 110000 | ||
| Transmission | 132000 | ||
| Transmission | 150000 | ||
| Transmission | 220000 | ||
| Transmission | 225000 | ||
| Transmission | 400000 |
These values are used for quality control in some OSM tools. If you change them, please also report it by creating an issue on GitHub. More information about country voltage QA.
Operators
| Operator | Network | Wikidata | Website | Wikipedia | Operating area | Information | Label | Taginfo |
|---|---|---|---|---|---|---|---|---|
| TODO | {{{network}}} | Q99999 WhatLinksHere |
TODO | TODO | operator=TODOoperator:wikidata=Q99999
|
operator=TODO |
Interconnections
| Neighbour country | Structure name | Year of commissioning | Technology | Voltage | Local end | Foreign end | OSM circuit | Notes |
|---|---|---|---|---|---|---|---|---|
| TODO | xxx |
Planned projects
- ...
Data Sources
| Source | License | Date | Suitable for OSM | Notes |
|---|---|---|---|---|
| xxx | ? | no | - |
Network statistics
Morocco has 119 power plants totalling 11,410 MW and 37,152 km of power lines mapped on OpenStreetMap (from OpenInfraMap, last update 2025-09-13)
Power line
| Power Lines Voltage | Length | Circuit or Line | Source | Date |
|---|---|---|---|---|
| 60kv | 13535 km | Unsure | https://www.one.org.ma/ | 2023 |
| 150kv | 147 km | Unsure | https://www.one.org.ma/ | 2023 |
| 225kv | 11259 km | Unsure | https://www.one.org.ma/ | 2023 |
| 400kv | 4164 km | Unsure | https://www.one.org.ma/ | 2023 |
| Total | 29105 km | Unsure | https://www.one.org.ma/ | 2023 |
| Power Lines Voltage | Length |
|---|---|
| < 10 kV | 2 km |
| 10 kV - 25 kV | 9,192 km |
| 25 kV - 52 kV | 1 km |
| 52 kV - 132 kV | 10,734 km |
| 132 kV - 220 kV | 102 km |
| 220 kV - 330 kV | 8,851 km |
| 330 kV - 550 kV | 1,988 km |
| > 550 kV | 0 km |
| No voltage tagged | 6,279 km |
| Total | 37,152 km |
Electricity generation
Mapping process and community
Mapping success stories
Success stories are designed to highlight important contributions. Have you significantly improved the cartography of a country (added a new line, a power station, etc.)? Don't be shy, let us know below.
- Mwiche [2025-04]: Added several substations around the country, using satellite images.
- Mwiche [2025-04]: I was able to extend lines and connect them to the grid.
- Fanfouer (talk) 22:31, 22 August 2025 (UTC) : Updated power grid between Agadir and Marrakech, with 24
power=circuitrelation creation or edit. Most recent substations are missing but satellite imagery is pretty neat
Encountered problems and places to improve
- Mwiche [2025-04]: The satellite images were of varying qualities for different regions, so I had to combine all sources available.
- Mwiche [2025-04]: Many urban towers are still missing and lines could not be connected to substation in urban areas.
- Mwiche [2025-04]: The grid still has some line splits and routing issues that still needs to be fixed.
- Mwiche [2025-04]: For some lines voltages are still missing.
- Mwiche [2025-04]: A lot of substations are missing meta data information
- Mwiche [2025-04]: There are errors in the past mapping that could be resolved.
Use of mapping strategies
Mapping strategies refer to Power networks/Guidelines#Mapping strategies. They are used for a methodical improvement of the OSM database. Once you have fully applied a strategy in this country, you should add or update your name, the date, the strategy, and a comment below. This way, other users can see whether it is worthwhile to carry out further investigations.
- Search for "Unfinished major power lines" - last time applied by Mwiche [2025-04]
- Searching for power plant connection - last time applied by Mwiche [2025-04]
- Searching for substation connection - last time applied by Mwiche [2025-04]
- Searching for parallel lines - last time applied by Mwiche [2025-04]
- Identifying obvious gaps in the network topology from a national perspective - last time applied by Mwiche [2025-04]
- Identifying new substations and transmission lines - last time applied by Mwiche [2025-04]