Power networks/Jordan
| Jordan (JO) | |
|---|---|
| References | |
| OpenStreetMap | 184818 |
| Wikidata | Q810 |
| Wikipédia | Jordan Energy in Jordan |
| Country characteristics | |
| Continent | Asia |
| Population | 10,428,241 |
| Area | 89,341 km2 |
| GDP | 47.5 B$ |
| Language(s) | Arabic |
| Electrical Network | |
| Generation capacity | 6,084 MW (OSM) |
| Power line length | 2,772 km (OSM) |
| Frequency | 50 Hz |
| Transmission lines voltages (kV) | 400 - 132 |
| Data from Wikidata (last update 2025-09-13) and OpenInfraMap (last update 2025-09-13) | |
This page has been created through the power networks country page template. Check the template page for more information on how to complete it.
High-voltage Electrical Network
State of the map
in 2025-09:
Network description
Voltages and frequency
Frequency : 50 Hz
| Network | Voltage | Comments | Appearance |
|---|---|---|---|
| Transmission | 400 kV | ||
| Transmission | 132 kV |
These values are used for quality control in some OSM tools. If you change them, please also report it by creating an issue on GitHub. More information about country voltage QA.
Operators
| Operator | Network | Wikidata | Website | Wikipedia | Operating area | Information | Label | Taginfo |
|---|---|---|---|---|---|---|---|---|
| NEPCO | {{{network}}} | Q99999 WhatLinksHere |
https://nepco.com.jo/en | TODO | operator=NEPCOoperator:wikidata=Q99999
|
operator=NEPCO |
Interconnections
| Neighbour country | Structure name | Year of commissioning | Technology | Voltage | Local end | Foreign end | OSM circuit | Notes |
|---|---|---|---|---|---|---|---|---|
| Egypt | Egyptian-Jordanian Electrical Interconnection | sea cable | 400 kV | 13 km | ||||
| Syria | Jordanian-Syrian Electrical Interconnection | 400 kV | 147 km | |||||
| Lebanon | Jordanian-Lebanese Electrical Interconnection | 132 kV | Through Syrian Grid | |||||
| Palestine | Jordanian-Palestinian Electrical Interconnection (Jericho) | 132 kV | 30 km | |||||
| Saudi Arabia | Jordanian-Saudi Electrical Interconnection | 400 kV | 112 km in Jordanian Territory + 52 km in Saudi Territory | |||||
| Iraq | Jordanian-Iraqi Electrical Interconnection | 400 kV | 330 km in Iraqi Territory + 6 km in Jordanian Territory |
Planned projects
Data Sources
| Source | License | Date | Suitable for OSM | Notes |
|---|---|---|---|---|
| Jordan - Electricity Transmission Network | CC BY | 2017 | no | very schematic |
| MENA - Electricity Transmission Network | CC BY | 2017 | no | same as above, aggregated with other surrounding countries |
| xxx | ? | no | - | |
| Electric System - National Electric Power Company | ? | ? | ? | - |
Network statistics
Jordan has 103 power plants totalling 6,084 MW and 2,772 km of power lines mapped on OpenStreetMap (from OpenInfraMap, last update 2025-09-13)
Power line
| Power Lines Voltage | Length |
|---|---|
| < 10 kV | 0 km |
| 10 kV - 25 kV | 0 km |
| 25 kV - 52 kV | 0 km |
| 52 kV - 132 kV | 0 km |
| 132 kV - 220 kV | 1,834 km |
| 220 kV - 330 kV | 0 km |
| 330 kV - 550 kV | 800 km |
| > 550 kV | 0 km |
| No voltage tagged | 136 km |
| Total | 2,772 km |
Electricity generation
Mapping process and community
Mapping success stories
Success stories are designed to highlight important contributions. Have you significantly improved the cartography of a country (added a new line, a power station, etc.)? Don't be shy, let us know below.
- nlehuby [2025-08]: create 8 substations (Irbid East, Dulail, Al-Rama, Madaba, Tafila, Mass wind, New Karak, Amman South solar)
- nlehuby [2025-08]: create 2 132 kV power lines from Dulail substation
- nlehuby [2025-08]: create 2 132 kV power lines around Al Rajhi cement
- nlehuby [2025-08]: create one 132 kV power line around Irbid East substation
- nlehuby [2025-08]: create one 132 kV power line around Tafila substation
- nlehuby [2025-08]: create one 132 kV power line around Amman South solar substation
- nlehuby [2025-08]: create one 132 kV power line around Al-Rajif substation
- nlehuby [2025-08]: create 2 132 kV power lines around Al-Rama substation
- nlehuby [2025-08]: create 3 132 kV power lines around Xenel wind and Kospo wind substations
- nlehuby [2025-08]: add towers to power line between Amman West & Salt substations
- nlehuby [2025-08]: fix voltage for most 400kV lines
Encountered problems and places to improve
- nlehuby [2025-08]: Still missing a few lines and substations around Amman city
- nlehuby [2025-08]: Have to wait for newer imagery to finish some lines and substations
- nlehuby [2025-08]: I were unable to finish the Jordanian-Palestinian Interconnection (from Al-Rama substation I guess)
- nlehuby [2025-08]: I were unable to find the Jordanian-Iraqi Electrical Interconnection mentionned on NEPCO website (from Al-Risha substation I guess)
- nlehuby [2025-08]: I were unable to find the Jordanian-Saudi Electrical Interconnection mentionned on NEPCO website
Use of mapping strategies
Mapping strategies refer to Power networks/Guidelines#Mapping strategies. They are used for a methodical improvement of the OSM database. Once you have fully applied a strategy in this country, you should add or update your name, the date, the strategy, and a comment below. This way, other users can see whether it is worthwhile to carry out further investigations.
- Search for "Unfinished major power lines" - last time applied by nlehuby [2025-08]
- Searching for substation connection - last time applied by nlehuby [2025-08]
- Searching for parallel lines - last time applied by nlehuby [2025-08]
- Identifying obvious gaps in the network topology from a national perspective - last time applied by nlehuby [2025-08]
- Identifying new substations and transmission lines - last time applied by nlehuby [2025-08]