Power networks/Colombia
| Colombia (CO) | |
|---|---|
| References | |
| OpenStreetMap | 120027 |
| Wikidata | Q739 |
| Wikipédia | Colombia |
| Country characteristics | |
| Continent | South America |
| Population | 52,321,152 |
| Area | 1,141,748 km2 |
| GDP | 343.9 B$ |
| Language(s) | Spanish |
| Electrical Network | |
| Generation capacity | 14,989 MW (OSM) |
| Power line length | 19,212 km (OSM) |
| Frequency | 60 Hz |
| Transmission lines voltages (kV) | 15 - 25 - 34.5 - 66 - 110 - 115 - 138 - 220 - 230 - 500 |
| Data from Wikidata (last update 2025-09-13) and OpenInfraMap (last update 2025-09-13) | |
This page has been created through the power networks country page template. Check the template page for more information on how to complete it.
High-voltage Electrical Network
State of the map

Network description
Voltages and frequency
Frequency : 60 Hz
| Network | Voltage | Comments | Appearance |
|---|---|---|---|
| Transmission | 15000 | ||
| Transmission | 25000 | ||
| Transmission | 34500 | ||
| Transmission | 66000 | ||
| Transmission | 110000 | ||
| Transmission | 115000 | ||
| Transmission | 138000 | ||
| Transmission | 220000 | ||
| Transmission | 230000 | ||
| Transmission | 500000 |
These values are used for quality control in some OSM tools. If you change them, please also report it by creating an issue on GitHub. More information about country voltage QA.
Operators
Interconnections
| Neighbour country | Structure name | Year of commissioning | Technology | Voltage | Local end | Foreign end | OSM circuit | Notes |
|---|---|---|---|---|---|---|---|---|
| TODO | xxx |
Planned projects
- ...
Data Sources
| Source | License | Date | Suitable for OSM | Notes |
|---|---|---|---|---|
| Centrales de generación eléctrica del sistema interconectado 2008 | ? | 2008 | ? | - |
| Plan Maestro: Tomo II: Plan de Expansión de Transmisión 2024-2038 | ? | ? | ? | - |
| Subestaciones construidas STN - STR | ? | ? | ? | - |
| Transmisión de energía eléctrica-UPME | ? | ? | ? | - |
| Transmission grid - (Includes capacity data) | ? | ? | ? | - |
| xxx | ? | no | - |
Documents
- |Plan maestro de modernizasion y expansion de la infraestructura de transmision electrica - Tomo 1
- |Enlaza proyectos en desarollo
- | Paratec - Parametros tecnicos del SIN
Network statistics
Colombia has 221 power plants totalling 14,989 MW and 19,212 km of power lines mapped on OpenStreetMap (from OpenInfraMap, last update 2025-09-13)
Power line
| Power Lines Voltage | Length | Circuit or Line | Source | Date |
|---|---|---|---|---|
| 66kv | 221 km | Circuit | https://paratec.xm.com.co/mapa | Unknown |
| 110kv | 3863 km | Circuit | https://www.upme.gov.co/simec/energia-electrica/transmision-de-energia-electrica/ | 2024 |
| 115kv | 8515 km | Circuit | https://www.upme.gov.co/simec/energia-electrica/transmision-de-energia-electrica/ | 2024 |
| 220kv | 2598 km | Circuit | https://www.upme.gov.co/simec/energia-electrica/transmision-de-energia-electrica/ | 2024 |
| 230kv | 11000 km | Circuit | https://www.upme.gov.co/simec/energia-electrica/transmision-de-energia-electrica/ | 2024 |
| 500kv | 4051 km | Circuit | https://www.upme.gov.co/simec/energia-electrica/transmision-de-energia-electrica/ | 2024 |
| Total | 30248 km | Circuit |
| Power Lines Voltage | Length |
|---|---|
| < 10 kV | 0 km |
| 10 kV - 25 kV | 82 km |
| 25 kV - 52 kV | 1 km |
| 52 kV - 132 kV | 4,682 km |
| 132 kV - 220 kV | 0 km |
| 220 kV - 330 kV | 8,763 km |
| 330 kV - 550 kV | 3,849 km |
| > 550 kV | 0 km |
| No voltage tagged | 1,832 km |
| Total | 19,212 km |
Electricity generation
Mapping process and community
Mapping success stories
TODO : Success stories are designed to highlight important contributions. Have you significantly improved the cartography of a country (added a new line, a power station, etc.)? Don't be shy, let us know below.
- Example : NAME [DATE YYYY-MM-DD]: My success stories in words.
Encountered problems and places to improve
- ....
Use of mapping strategies
TODO : Mapping strategies refer to Power networks/Guidelines#Mapping strategies. They are used for a methodical improvement of the OSM database. Once you have fully applied a strategy in this country, you should add or update your name, the date, the strategy, and a comment below. This way, other users can see whether it is worthwhile to carry out further investigations.
- Example : Search for "Unfinished major power lines" - last time applied by XXX [2025-MM-DD]
- .... - last time applied by XXX [2025-MM-DD]