Power networks/Chile
| Chile (CL) | |
|---|---|
| References | |
| OpenStreetMap | 167454 |
| Wikidata | Q298 |
| Wikipédia | Chile |
| Country characteristics | |
| Continent | South America |
| Population | 19,458,000 |
| Area | 756,102 km2 |
| GDP | 301.0 B$ |
| Language(s) | Spanish |
| Electrical Network | |
| Generation capacity | 35,316 MW (OSM) |
| Power line length | 27,826 km (OSM) |
| Frequency | ... Hz |
| Transmission lines voltages (kV) | 13.8 - 15 - 23 - 33 - 34.5 - 66 - 69 - 100 - 110 - 154 - 220 - 345 - 500 |
| Data from Wikidata (last update 2025-09-13) and OpenInfraMap (last update 2025-09-13) | |
This page has been created through the power networks country page template. Check the template page for more information on how to complete it.
High-voltage Electrical Network
State of the map
TODO : Take a JOSM screenshot of the country current power network. More info in power networks country page template
Network description
Voltages and frequency
Frequency : TODO Hz
| Network | Voltage | Comments | Appearance |
|---|---|---|---|
| Transmission | 13800 | ||
| Transmission | 15000 | ||
| Transmission | 23000 | ||
| Transmission | 33000 | ||
| Transmission | 34500 | ||
| Transmission | 66000 | ||
| Transmission | 69000 | ||
| Transmission | 100000 | ||
| Transmission | 110000 | ||
| Transmission | 154000 | ||
| Transmission | 220000 | ||
| Transmission | 345000 | ||
| Transmission | 500000 |
These values are used for quality control in some OSM tools. If you change them, please also report it by creating an issue on GitHub. More information about country voltage QA.
Operators
| Operator | Network | Wikidata | Website | Wikipedia | Operating area | Information | Label | Taginfo |
|---|---|---|---|---|---|---|---|---|
| TODO | {{{network}}} | Q99999 WhatLinksHere |
TODO | TODO | operator=TODOoperator:wikidata=Q99999
|
operator=TODO |
Interconnections
| Neighbour country | Structure name | Year of commissioning | Technology | Voltage | Local end | Foreign end | OSM circuit | Notes |
|---|---|---|---|---|---|---|---|---|
| TODO | xxx |
Planned projects
- ...
Data Sources
| Source | License | Date | Suitable for OSM | Notes |
|---|---|---|---|---|
| Map of the electrical grid | ? | ? | ? | - |
| Sistema Eléctrico Nacional | ? | ? | ? | - |
| xxx | ? | no | - |
Network statistics
Chile has 937 power plants totalling 35,316 MW and 27,826 km of power lines mapped on OpenStreetMap (from OpenInfraMap, last update 2025-09-13)
Power line
| Power Lines Voltage | Length | Circuit or Line | Source | Date |
|---|---|---|---|---|
| Total | 40323 km | Circuit | https://www.coordinador.cl/sistema-electrico/ | 2025 |
| Power Lines Voltage | Length |
|---|---|
| < 10 kV | 8 km |
| 10 kV - 25 kV | 1,511 km |
| 25 kV - 52 kV | 325 km |
| 52 kV - 132 kV | 6,725 km |
| 132 kV - 220 kV | 727 km |
| 220 kV - 330 kV | 12,097 km |
| 330 kV - 550 kV | 2,921 km |
| > 550 kV | 0 km |
| No voltage tagged | 3,510 km |
| Total | 27,826 km |
Electricity generation
Mapping process and community
Mapping success stories
TODO : Success stories are designed to highlight important contributions. Have you significantly improved the cartography of a country (added a new line, a power station, etc.)? Don't be shy, let us know below.
- Example : NAME [DATE YYYY-MM-DD]: My success stories in words.
Encountered problems and places to improve
- ....
Use of mapping strategies
TODO : Mapping strategies refer to Power networks/Guidelines#Mapping strategies. They are used for a methodical improvement of the OSM database. Once you have fully applied a strategy in this country, you should add or update your name, the date, the strategy, and a comment below. This way, other users can see whether it is worthwhile to carry out further investigations.
- Example : Search for "Unfinished major power lines" - last time applied by XXX [2025-MM-DD]
- .... - last time applied by XXX [2025-MM-DD]