Power networks/Argentina

From OpenStreetMap Wiki
Jump to navigation Jump to search


Country Information
Argentina (AR)
Argentina flag

References
OpenStreetMaprelation 286393
WikidataQ414
WikipédiaArgentina
Country characteristics
ContinentSouth America
Population47,327,407
Area2,780,400 km2
GDP646.1 B$
Language(s)Spanish
Electrical Network
Generation capacity36,650 MW (OSM)
Power line length62,167 km (OSM)
Frequency... Hz
Transmission lines voltages (kV)...
Data from Wikidata (last update 2025-09-13)
and OpenInfraMap (last update 2025-09-13)

This page has been created through the power networks country page template. Check the template page for more information on how to complete it.

High-voltage Electrical Network

State of the map

TODO : Take a JOSM screenshot of the country current power network. More info in power networks country page template

Network description

Voltages and frequency

Frequency : 50 Hz

Network Voltage Comments Appearance
Transmission 500000 for bulk transmission on Transener network single-circuit towers
Transmission 400000 nationwide bulk transmission voltage, on Transnoa network in Noroeste region single-circuit towers
Transmission 330000 for bulk transmission on Transpa network in Patagonia single-circuit towers
Transmission 220000 all other major power lines usually around Buenos Aires, the Pampa region and Cuyo region double- or single-circuit towers or poles
Transmission 132000 used on the regional transmission networks to feed distribution networks double- or single-circuit towers or poles, or buried cable (such as in denser parts of Greater Buenos Aires)
Distribution 33000 Principally around Buenos Aires Province power poles along roads or railways, or buried cable

Operators

Operator Network Wikidata Website Wikipedia Operating area Information Label Taginfo
Transener Transmission Q3537471
WhatLinksHere
https://www.transener.com.ar Transener nationwide operator=Transener
operator:wikidata=Q3537471
operator=Transener
Edenor Distribution [[wikidata:|]]
WhatLinksHere
https://www.edenor.com Edenor Buenos Aires, Greater Buenos Aires operator=Edenor operator=Edenor
Edesur Distribution [[wikidata:|]]
WhatLinksHere
https://www.edesur.com.ar Edesur southern Buenos Aires Province, 12 partidos south of Buenos Aires operator=Edesur operator=Edesur
Edelap Distribution [[wikidata:|]]
WhatLinksHere
https://www.edelap.com.ar Edelap La Plata Partido operator=Edelap operator=Edelap

Interconnections

Neighbour country Structure name Year of commissioning Technology Voltage Local end Foreign end OSM circuit Notes
TODO xxx

Planned projects

  • ...

Data Sources

Source License Date Suitable for OSM Notes
Electric Generation and Transportation Maps ? 2024 ? -
Generación, Transporte y Distribución de Energía Eléctrica ? 2024 ? -
Información Energética ? ? ? -
Energía Eléctrica Información Geográfica ? 2023-2024 ? -
xxx ? no -


Network statistics

Argentina has 354 power plants totalling 36,650 MW and 62,167 km of power lines mapped on OpenStreetMap (from OpenInfraMap, last update 2025-09-13)


Power line

Power Lines Voltage Length
From OpenInfraMap, last update 2025-09-13
< 10 kV 35 km
10 kV - 25 kV 648 km
25 kV - 52 kV 4,474 km
52 kV - 132 kV 764 km
132 kV - 220 kV 34,148 km
220 kV - 330 kV 2,621 km
330 kV - 550 kV 16,089 km
> 550 kV 0 km
No voltage tagged 3,385 km
Total 62,167 km


Electricity generation

Mapping process and community

Mapping success stories

TODO : Success stories are designed to highlight important contributions. Have you significantly improved the cartography of a country (added a new line, a power station, etc.)? Don't be shy, let us know below.

  • Example : NAME [DATE YYYY-MM-DD]: My success stories in words.

Encountered problems and places to improve

  • ....

Use of mapping strategies

TODO : Mapping strategies refer to Power networks/Guidelines#Mapping strategies. They are used for a methodical improvement of the OSM database. Once you have fully applied a strategy in this country, you should add or update your name, the date, the strategy, and a comment below. This way, other users can see whether it is worthwhile to carry out further investigations.

  • Example : Search for "Unfinished major power lines" - last time applied by XXX [2025-MM-DD]
  • .... - last time applied by XXX [2025-MM-DD]

References