OpenStreetMap logo OpenStreetMap

Changeset When Comment
123413459 over 3 years ago

It took me a whole day, but because it was more than 10,000 edits (the limit of one changeset), JOSM split it up.

123413459 over 3 years ago

Hi,
No, I am manually tracing these land use areas from swisstopo SWISSIMAGE imagery.
Have a nice day!
jmarchon

123666843 over 3 years ago

First changeset from a Linux-based system!

123524440 over 3 years ago

*issue

115398005 over 3 years ago

Thank you for bringing this issue to my attention. I modified existing building footprints that looked very inaccurate when compared to Swisstopo imagery. Since it seemed like bad data to me, I fixed it. But if you believe this is not the effect my edits had on the map, I will refrain from further edits like this one, since you are likely a more experienced mapper.

Thank you and have a nice day!

117724210 over 3 years ago

OK, leaving it at 200 for now sounds good. Maybe write a note linking to this discussion, to prevent further confusion? It appears that the maxspeed tag has been changed many times before.

117724210 over 3 years ago

Hmm. After doing some more research, it looks to me like we have a lot of contradicting evidence, making me unsure as to which is correct.

Your website says: "Dazu gehört etwa, dass der Tunnel vorerst für eine Höchstgeschwindigkeit von 200 km/h zugelassen wird. Im Hinblick auf den Einsatz von schnelleren Zügen werden die Anlagen für Geschwindigkeiten bis 250 km/h bereit sein.", which somewhat translates to that for now the max speed is 200 km/h, and soon it will be 250. However, that article was written 6 years ago in December of 2016.
https://www.admin.ch/gov/de/start/dokumentation/medienmitteilungen.msg-id-64811.html

The English version of the website I cited states that the max speed is 249 km/h. The German version, however, says that "Die maximal zulässige Geschwindigkeit beträgt 230 km/h.", or ~"the max allowed speed is 230 km/h". I don't know when any of these 2 were written.
https://company.sbb.ch/en/media/background-information/gotthard-base-tunnel.html
https://company.sbb.ch/de/medien/dossier-medienschaffende/gotthard-basistunnel.html

The English Wikipedia article on the GBT also states the max speed is 249 km/h. Its source is however the same as my original one.
https://en.wikipedia.org/w/index.php?title=Gotthard_Base_Tunnel&oldid=1088176602

This document from the Swiss government, dating from June 2015, says that the max speed both is AND will be 250 km/h: https://www.news.admin.ch/NSBSubscriber/message/attachments/39644.pdf

This website from September of 2021 says the max speed is 249 km/h: https://www.railway-technology.com/projects/gotthard-base-tunnel/#:~:text=The%20maximum%20permitted%20speed%20for%20passenger%20trains%20travelling%20through%20the%20tunnel%20is%20249km/h%2C

This document from the company that built the tunnel (AlpTransit Gotthard AG) says the max speed is 250 km/h (page 7): https://www.alptransit.ch/fileadmin/dateien/gotthard/facts-and-figures-gotthard-base-tunnel_e.pdf
It is from June of 2016.

Thank you for your respectful and responsive participation in this discussion. I do not wish to offend or condemn your activity on OSM and hope you have a nice day.

jmarchon

117724210 over 3 years ago

Shouldn't the maxspeed be 249 km/h? This website clearly states that "The maximum speed permitted is 249 km/h."
https://company.sbb.ch/en/media/background-information/gotthard-base-tunnel.html#:~:text=What%20is%20the,249%20km/h.

115536623 over 3 years ago

Hallo Nzara,
I believe I have now fixed this in changeset #120894679. Thank you for pointing out my mistakes and making me a better mapper!

119869690 over 3 years ago

My 1500th changeset!

117033737 almost 4 years ago

Forgot the comment again:
Modified a restaurant that is closing soon

116341072 almost 4 years ago

Looks like I forgot a comment somehow so here it is:
Added and modified building footprints for DAMN project number 2362 https://client.damn-project.org/?area=2362

116167184 almost 4 years ago

I agree with the above comment

114472086 almost 4 years ago

Hallo,
Danke fuer die Tips.
:)
jmarchon

107291917 almost 4 years ago

Ah ok. I'll leave it then. Have a nice day!

107291917 almost 4 years ago

Are you sure that Ingram Lane connects Milton Lane to Orchard Home Drive? On Bing imagery, there are some buildings and a field in the way.