1. Cycling is not permitted on train station platforms - changed - changed bicycle=yes to bicycle=dismount

    Closed
    #158564203 0 10 0 0
  2. Jo Haylen has directed TfNSW to retain these proposed cycleway plans in upcoming works

    Closed
    #158564171 14 8 0 0
  3. King St cycleway expected to start construction Q1 2025

    Closed
    #158564052 0 2 0 0
  4. Update expected construction start date for King to College cycleway

    Closed
    #158564025 0 1 0 0
  5. Update POIs from Mapillary imagery

    Closed
    #158531648 7 7 6 0
  6. Add further POIs from Mapillary Imagery

    Closed
    #158530614 2 3 0 0
  7. Add more POIs using Mapillary imagery

    Closed
    #158530303 3 2 0 0
  8. Add POIs using own Mapillary imagery

    Closed
    #158530042 6 6 0 0
  9. Add crossing nodes where new Castlereagh St cycleway intersects a footpath crossing or road.

    Closed
    #158522828 6 10 0 0
  10. Fix geometry of Castlereagh St cycleway at north end to connect to King St cycleway

    Closed
    #158522767 3 5 0 0
  11. Castlereagh St cycleway will open Friday morning.

    Closed
    #158521222 0 3 0 0
  12. Add Liberty Place

    Closed
    #158440846 3 2 0 0
  13. Fix check_date and opening_date tagging

    Closed
    #158440758 0 3 0 0
  14. Castlereagh St bus lane is 15:00 to 20:00 Mo-Fr. Updated cycleway:left to no and cycleway:right to separate.

    Closed
    #158440723 0 9 0 0
  15. Update opening date of Castlereagh St cycleway

    Closed
    #158439556 0 3 0 0
  16. Survey on foot

    Closed
    #158439523 1 3 0 0
  17. Survey portions of Castlereigh St cycleway which is opening soon. Further work needed on bus lane and parking tagging and building addresses at south of changeset.

    Closed
    #158439454 18 19 3 0
  18. Survey on foot (though not a local)

    Closed
    #158438890 6 9 1 0
  19. Survey on foot (though not a local)

    Closed
    #158190463 1 1 0 0
  20. Survey on foot (though not a local)

    Closed
    #158150775 9 21 0 0