-
Adjusted MBTA CR-Fairmount train route to be single direction (Readville -> South Station since that had the most existing relation members) and to contain all of the expected relation members for PTv2.
Closed
-
Add `gtfs:stop_id` tags to all stop areas, platforms, and stop positions on the MBTA Fairmount Line
Closed
-
Specify whether pedestrian crossings have islands
Closed
-
Specify parking types
Closed
-
Specify surfaces
Closed
-
Add operator=MBTA and network=MBTA for all of the NHRML and Wildcat Branch that the MBTA owns and operates.
Closed
-
Add operator=MBTA on trackage around the Wachusett Layover area that the MBTA build
Closed
-
Remove operator:passenger=MBTA on single crossover track that the MBTA is unlikely to make use of.
Closed
-
Add network=MBTA to tracks that the MBTA regularly runs Fitchburg Line trains on and operator=MBTA for tracks which they use in irregular operations.
Closed
-
Specify whether pedestrian crossings have islands
Closed
-
Specify whether parking requires a fee
Closed
-
Specify parking types
Closed
-
Specify surfaces
Closed
-
Specify parking types
Closed
-
Specify whether pedestrian crossings have islands
Closed
-
Specify surfaces
Closed
-
Add operator:passenger=MBTA and remove network=MBTA from NHRML trackage that the MBTA owns but does not regularly use for commuter rail, but is used for freight.
Closed
-
Fix network and operator tags on single Needham Branch bridge which was originally missed
Closed
-
Fix operator and network tags for small sections of the Needham Branch to properly indicate the MBTA operating it and where it's a part of the MBTA network.
Closed
-
Add network=MBTA and operator=MBTA to the Dorchester Branch tracks where the MBTA owns and operates them
Closed