1. Add operator:passenger=MBTA for the shared freight/passenger tracks near Pilgrim Junction and on the Middleboro Subdivision

    Closed
    #140763389 0 16 0 0
  2. Add operator=MBTA for the tracks at the MBTA layover near Middleborough MBTA station

    Closed
    #140763044 0 5 0 0
  3. Set operator=MBTA and owner tags on MBTA subway non-revenue tracks

    Closed
    #140762349 0 217 0 0
  4. Set operator=MBTA and owner tags on MBTA Blue Line revenue tracks

    Closed
    #140762145 0 99 0 0
  5. Set operator=MBTA and owner tags on MBTA Orange Line revenue tracks

    Closed
    #140762087 0 122 0 0
  6. Set operator=MBTA and owner tags on MBTA Red Line revenue tracks

    Closed
    #140762016 0 163 0 0
  7. Remove role=route from tracks associated with the Mattapan Trolley route relation

    Closed
    #140760777 0 2 0 0
  8. Revert ref=Fairmount Line changes back to ref=CR-Fairmount for MBTA Fairmount Line route and route master.

    Closed
    #140760543 0 3 0 0
  9. Set name=Mattapan Trolley for 3 tracks that had not yet been updated for the name change

    Closed
    #140741580 0 3 0 0
  10. Set operator=MBTA and owner tags on Mattapan Trolley tracks

    Closed
    #140741545 0 46 0 0
  11. Remove construction=light_rail on service tracks for the Green Line Extension which have entered service

    Closed
    #140741527 0 5 0 0
  12. Set operator=MBTA and owner tags on remaining MBTA Green Line service tracks

    Closed
    #140741508 0 34 0 0
  13. Set operator=MBTA and owner tags on all MBTA Green Line East Somerville Complex tracks

    Closed
    #140741441 0 30 0 0
  14. Set operator=MBTA and owner tags on all MBTA Reservoir Yard/Carhouse tracks

    Closed
    #140741413 0 58 0 0
  15. Set operator=MBTA and owner tags on all MBTA Lake Street Yard (Green Line (B)) tracks

    Closed
    #140741393 0 15 0 0
  16. Set operator=MBTA and owner tags on all Riverside Carhouse (Green Line (D)) tracks

    Closed
    #140741358 0 75 0 0
  17. Set operator=MBTA and owner tags on all revenue Green Line tracks

    Closed
    #140741183 0 204 0 0
  18. Fix MBTA Green Line (D) track usage at Park Street station since it was showing as routing onto the wrong track.

    Closed
    #140740948 0 5 0 0
  19. Adjusted MBTA Fairmount Line route master and routes to reflect the proper GTFS route name/ref and also use South Station (MBTA) instead of Boston South Station (Amtrak)

    Closed
    #140740611 0 3 0 4
  20. Add MBTA CR-Fairmount route for the standard outbound direction (South Station to Readville) and add the expected relation members.

    Closed
    #140740349 1 0 0 0