Hans_Hy's Comments
| Changeset | When | Comment |
|---|---|---|
| 158674503 | about 1 year ago | Now show the distribution of circuits = 1 or circuits = 2. Tag Info - "No English language description for this tag in the wiki." Overview - 2,585 uses, out of tens of millions of towers mapped. Chronology - is not used until Summer of 2020 (12 years after OSM started). All these lines were mapped properly and tagged properly before these extra towers and the 1/3 tag was added. They add no value to the project, clutter maps and unnecessarily weight sections of lines.... similar to adding rail marshaling yards that do not exist to a rail line. |
| 158665045 | about 1 year ago | Talk about "double tagging".... that is exactly what you are doing with 3 phases for direction changes of 500KV and 750kV circuits. Learn how substations are laid out with different voltage switchyards and transformers between them, and then you'll have less conflicts in your mapping.
|
| 158738442 | about 1 year ago | Why do you revert back to a natural setting that does not exist? A new power plant and the building it is enclosed in was built here by 2019... including racking to connect steam (district/process heat) pipes to the NEW paper factory and the existing chemical factory... both of which were targets of recent Ukrainian drone strikes. Are you blind and can't see it with satellite images showing construction starting in 2014? |
| 158789272 | about 1 year ago | Oh look, another location... two sets of three 500/220kV single phase transformers that are not detailed... but oh look every fucking "monopolar" tower and phase of the 500kV circuits are detailed!
|
| 158789272 | about 1 year ago | Here is yet another, although only 1 set (3) single phase 500/220kV transformers....
Of course, I would correct/improve this location, if idiots like you wouldn't revert everything I do!!! |
| 158789272 | about 1 year ago | just one of dozens of this configuration, inside russia.... https://openinframap.org/#15.74/55.096104/43.94202 using two sets of three 500/220kV single phase transformers. This is the most common high voltage transformer configuration inside Russia & the UES. |
| 158663049 | about 1 year ago | I added the most common high voltage transformer in the UES to Konakovskaya TES... 500/220kV single phase, and you fucking revert the additions!!! Why? Because you are fucking moron! |
| 158663049 | about 1 year ago | You're a fucking idiot! You have no idea what was wrong with this build, can't be bothered to look at street view that verifies there is no 35kV in this high voltage station and that it is as I rebuilt it.
|
| 158621221 | about 1 year ago | Great job, thanks! But don't let press releases or satellite images with the new Combined Cycle Power Plant clearly visible on them stop you for exerting your control to revert any additions/changes. |
| 158674503 | about 1 year ago | Look at this and tell me each circuit having "3x weighting" is in any way correct? And for what, because someone needs to map every tower individually. When do we start mapping the 2 tower feet of an H-Tower, or the 4 feet of lattice towers. There is no reason to map all 3 monopolar towers and the individual phases. |
| 158674503 | about 1 year ago | No one maps high voltage circuits, seperating out single phases and noting as "1/3" except for the group of editors working around Moscow & Russia. The 3 towers are one functional unit, no differently than th e power line with all 3 of its phases is a single functional unit. Now you have reverted all my corrections to this flawed/incorrect and non-electric grid industry standard editors have adopted for themselves on OSM. |
| 158674503 | about 1 year ago | see the wiki on monopolar or guyed monopolar... Mostly used as an anchor tower at very high voltage and/or long spans. This tower type is typically used in groups of three, with each carrying one phase. There are two recommended options for mapping such a group. Either map all three towers and connect the power line to the middle tower. Or map only one tower and add the attribute triple_tower=yes to the tower. No recommendations for splitting out the phases and noting Circuit = 1/3 |
| 158674503 | about 1 year ago | Why?
|
| 131552941 | almost 3 years ago | Here you have reverted two 500kV 3Phase generator transformers & one 220kV 3 phase generator transformers at Unit 5. You reverted six 500/220kV single phase transformers at the 220kV yard. At Unit 3/4 you reverted three 500/220/x kV single phase, 3 winding transformers. Also, two 220kv 3 phase generator transformers. All of which, can be located in this product catalog or any LPT - Large Power Transformer OEM catalog. http://www.ztr.ua/files/ztr_d77-ztr_product_catalogue_2014.pdf |
| 131572022 | almost 3 years ago | Validate why you reverted this additions and returned to 6 non defined transformers? Additions (deleted)
Reverted back to
Here is a catalog from ZTR where you can locate all transformers I added this this site. http://www.ztr.ua/files/ztr_d77-ztr_product_catalogue_2014.pdf |