Minor tweaks to Etobicoke Creek Trail. In particular, removed some connections between the trail and high-traffic roads where a raised curb makes it obvious that it is not safe to go from one to the other.
Closed
-
Bollards only prevent access of motor vehicles.
Closed
-
Sign at intersection of Cosmo Rd with Bloor St West indicates left turns are not allowed.
Closed
-
There's an informal path running parallel to Mimico Creek that connects Cosmo Rd, Meadowvale Dr and Van Dusen Blvd.
Closed
-
Minor updates to Etobicoke Creek Trail
Closed
-
Updated connection of Mimico Creek Trail with Bloor St. West.
Closed
-
Surveyed the new Finch Ave West multiuse pathway connecting the Finch Hydro Corridor with the Humber River Trail. Some portions west of arrow road are still under construction but there is indeed a safe walkable/cycleable path all the way through.
Closed
-
Updated tracing of Finch Hydro Corridor Recreational Trail based on GPS and survey.
Closed
-
This portion of the sidewalk by Rutherford Rd is under construction and posted signs warn pedestrians to not enter. The road is being widened and cycle tracks are being added.
Closed
-
This bicycle ramp is slippery and a sign asks cyclists to dismount.
Closed
-
Planchet Road has very visible green sharrows now. Cafe Louise is closed and it appears like a new coffee shop will be opening there soon.
Closed
-
BSG Metrolinx underpass is still under construction.
Closed
-
Updated bike/pedestrian access to York Radiology
Closed
-
Updated pedestrian infrastructure around Edithvale Park.
Closed
-
Updated entrances to École secondaire catholique Monseigneur-de-Charbonnel
Closed
-
Re-tagged a good number of the double tracks around La Cappella SS. Crocifisso.
Closed
-
Improve routing of Pellat Ave.
Closed
-
Updated routing around West Oak Crescent, including fire route that is difficult to tag properly.
Closed
-
Updated offramps around HWY 400 and Finch Ave which are now controlled by street lights on the East side. There's also a new multiuse pathway on the south side of Finch Ave as per https://nitter.net/FinchWestLRT/status/1734951312591409644#m
Closed
-
Proposed MUP as part of the Finch West LRT. I haven't seen construction yet, but it's apparently part of the plan on record as per https://secure.toronto.ca/council/agenda-item.do?item=2016.EX13.9