1. Long-term/"permanent" skyway closure due to condemnation of two separate buildings: The Alliance Bank Center and the Capital City Plaza Parking Ramp.

    Closed
    #166272273 0 14 0 0
  2. Added precise conditional motor vehicle access tags to W 7th Pl (destination MV traffic is allowed from 5:00 - 10:30AM but MV access is otherwise prohibited).

    Closed
    #166272063 0 3 0 0
  3. Added some detail around Wabasha and W 7th Place, particularly pertaining to skyway access and pedestrian circulation.

    Closed
    #166265587 25 48 1 0
  4. Updated the Luce Line Regional Trail route relations to remove the detour and restore the relation to the new flyover bridge, now that it is open.

    Closed
    #166043472 0 2 1 0
  5. Updated speed limit and lane number tags for 10th St N/County Rd 10

    Closed
    #165897787 8 77 0 0
  6. The shoulders are not continuous (they disappear at every intersection) and I didn't see any signage designating this as a bike route. Given the high speeds and traffic volumes, I don't see any benefit to the cycleway tag. There are better parallel routes

    Closed
    #165896702 1 34 0 0
  7. The east side of the intersection of Arcade St and Wheelock Parkway is completely removed and dug up for sewer replacement until "late summer." https://www.dot.state.mn.us/metro/projects/e7th-arcade/

    Closed
    #165895500 4 9 0 0
  8. filled in some tags I missed in my last edit.

    Closed
    #165343235 1 3 0 0
  9. Updated geometry of new west river parkway path under the railroad bridge based on GPS traces from recent runs.

    Closed
    #165343152 48 8 0 0
  10. long-term construction closure of a small portion of Sheridan Ave spanning several months.

    Closed
    #165304562 1 12 0 0
  11. Portion of Bossen Terrace is closing for reconstruction until 9/30/25. Tagged as highway=construction b/c long-term construction closure spanning several months.

    Closed
    #165304486 2 4 1 0
  12. Tagged Lowry Ave NE as highway=construction because it is a long-term construction closure spanning several months.

    Closed
    #165304366 0 8 0 0
  13. "Full closure of Border Ave to Holden St to Royalston Ave N from March 27 to November 17" https://www.minneapolismn.gov/getting-around/parking-driving/road-closures-map/

    Closed
    #165304260 0 9 0 0
  14. Tagged Hennepin Ave between Franklin and 26th as highway=construction because it is a long-term construction closure lasting several months.

    Closed
    #165304149 0 9 0 1
  15. Tagged 1st Ave S as highway=construction because it is a multi-month, long-term closure.

    Closed
    #165303964 0 10 0 0
  16. added retaining wall next to 10th Ave bridge approach.

    Closed
    #164939613 3 0 0 0
  17. Added footpaths around apartment complex next to 10th Ave SE.

    Closed
    #164939498 46 21 0 0
  18. Added FixMe tag to 5th St SE, which is mapped as a one-way street, but is signed as a two-way street with turn restrictions to prevent cars from driving westbound, which is bikes only.

    Closed
    #164939216 0 5 0 0
  19. Refined geometry of 10th Ave over river.

    Closed
    #164938984 28 87 3 0
  20. "The bridge will be closed starting April 7, 2025 for about 8 months." https://www.minneapolismn.gov/government/projects/bridge-9/

    Closed
    #164396709 0 1 0 0