Long-term/"permanent" skyway closure due to condemnation of two separate buildings: The Alliance Bank Center and the Capital City Plaza Parking Ramp.
Closed
-
Added precise conditional motor vehicle access tags to W 7th Pl (destination MV traffic is allowed from 5:00 - 10:30AM but MV access is otherwise prohibited).
Closed
-
Added some detail around Wabasha and W 7th Place, particularly pertaining to skyway access and pedestrian circulation.
Closed
-
Updated the Luce Line Regional Trail route relations to remove the detour and restore the relation to the new flyover bridge, now that it is open.
Closed
-
Updated speed limit and lane number tags for 10th St N/County Rd 10
Closed
-
The shoulders are not continuous (they disappear at every intersection) and I didn't see any signage designating this as a bike route. Given the high speeds and traffic volumes, I don't see any benefit to the cycleway tag. There are better parallel routes
Closed
-
The east side of the intersection of Arcade St and Wheelock Parkway is completely removed and dug up for sewer replacement until "late summer." https://www.dot.state.mn.us/metro/projects/e7th-arcade/
Closed
-
filled in some tags I missed in my last edit.
Closed
-
Updated geometry of new west river parkway path under the railroad bridge based on GPS traces from recent runs.
Closed
-
long-term construction closure of a small portion of Sheridan Ave spanning several months.
Closed
-
Portion of Bossen Terrace is closing for reconstruction until 9/30/25. Tagged as highway=construction b/c long-term construction closure spanning several months.
Closed
-
Tagged Lowry Ave NE as highway=construction because it is a long-term construction closure spanning several months.
Closed
-
"Full closure of Border Ave to Holden St to Royalston Ave N from March 27 to November 17" https://www.minneapolismn.gov/getting-around/parking-driving/road-closures-map/
Closed
-
Tagged Hennepin Ave between Franklin and 26th as highway=construction because it is a long-term construction closure lasting several months.
Closed
-
Tagged 1st Ave S as highway=construction because it is a multi-month, long-term closure.
Closed
-
added retaining wall next to 10th Ave bridge approach.
Closed
-
Added footpaths around apartment complex next to 10th Ave SE.
Closed
-
Added FixMe tag to 5th St SE, which is mapped as a one-way street, but is signed as a two-way street with turn restrictions to prevent cars from driving westbound, which is bikes only.
Closed
-
Refined geometry of 10th Ave over river.
Closed
-
"The bridge will be closed starting April 7, 2025 for about 8 months." https://www.minneapolismn.gov/government/projects/bridge-9/
Closed