"reconstructing the Samuel H. Morgan Regional Trail between Lexington Parkway and Randolph. The off ramp to Sam Morgan Trail from the 35E bridge path will be closed. Construction will begin April 2025 and be complete by the end of August 2025."
Closed
-
The side of the Stone Arch that is closed has flipped. Only the far western end is now gated off.
Closed
-
Extended closure of I-494 trail over Minnesota River: http://www.dot.state.mn.us/metro/projects/i494mnriverbridge/
Closed
-
some fine-tune adjustments to the Graco Park trails to try to more closely match what's on the ground.
Closed
-
Unfortunately this is not yet an active construction site. Fortunately, it is still widely used for biking and walking.
Closed
-
Updated alignment of the asphalt bike path extension to the 26th Ave N Overlook. There is also a concrete walking path, but I don't have a good GPS trace of it.
Closed
-
updated trail alignments at Graco Park.
Closed
-
Updated tags for Cedar Lake Trail through downtown. This portion of the trail is now officially reopened. It was previously passable this summer only during non-working hours.
Closed
-
New curb cuts for a more direct crossing have been added!
Closed
-
Added details related to Green Bay Trail access in Winnetka.
Closed
-
refined precision of mapping around Anwatin Pond.
Closed
-
missed a little detail
Closed
-
Added new segment of Oak St bikeway that was recently completed.
Closed
-
Added some details related to public spaces and circulation at North Loop Green.
Closed
-
Mendota Bridge trail reopens 9/1
Closed
-
updated some pavement tags. Also, the temporary trail around the Graco Park construction site has been removed, with trail traffic currently routed onto 10th Ave NE. The Graco Park trails will open soon.
Closed
-
Kellogg Bridge closed for approximately 3 years https://www.stpaul.gov/projects/public-works/pw2021kellogg3rdbridge
Closed
-
These slip lanes are gone for good.
Closed
-
I was wondering why apps still aren't routing bikes onto the U of M transitway, a signed, designated bike route. Documentation for Highway=Busway says it implies Access=No, so I changed to Highway=Service with Busway=Designated and Motor_Vehicles=No tags.
Closed
-
Added pavement surface tags to 17th Ave Bike Boulevard.
Closed