| 148312717 | about 2 months ago | Hi again nyanpsyche, if you could please let me know what your source is for the detailed placement of these underground cables, I'd like to verify. Thank you! According to BC Hydro, they most likely run East-West along West 7th Ave. |
| 173601864 | about 2 months ago | Hi nyanpsyche, what is your source for this data? I don't see how the southern portion of this cable could continue down Prince Edward St, because according to BC Hydro maps, it connects Murrin and Mt Pleasant Substations (Alberta & West 6th Ave). Also, what is your source for the ref code 2L53? This code is already used for a cable connected to Mainwaring Sub, which doesn't connect to Murrin as far as I know! Thanks! |
| 134040282 | 8 months ago | Hi, you seem to have tagged all SkyTrain ways as being "UTO" which is not true. Please undo this, and pay closer attention to the existing tags for "ATC" which are more accurate and specifyt which ways provide ATC (CBTC). |
| 96410874 | almost 2 years ago | Hi, thanks for asking. It is indeed a range of interval, it was accurate at the time I tagged it, 3 years ago. It is based on the schedule on their website. The train leaves every 1-4 days, but there is no single interval. I thought it would be better than no tag at all. |
| 114238620 | almost 2 years ago | Hello, in this changeset, you added unclosed ways tagged as boundary. The way way/1006279722 seems to connect two creeks. What is your source for this? These don't seem to actually connect. |
| 134930006 | over 2 years ago | Hi, your edit deleted a lot of information about this building's parts. Also, the footprint is now inaccurate. |
| 123486944 | over 2 years ago | For some reason, a node in a pipeline was also moved in this changeset. I moved it back. |
| 105080898 | over 2 years ago | Hello, you incorrectly tagged a 25kV power line as 69kV. I corrected this. Please be more careful. |
| 135908476 | over 2 years ago | added |
| 129949818 | almost 3 years ago | Hi, I think the tags in this relation are correct, but I think it should be deleted. First, service currently does not exist on this track. And second, when the subway opens, the Millennium line will just be extended. A new relation is not required. |
| 111798775 | almost 3 years ago | Agreed, I deleted it. The void "cavernous" space still exists apparently, but I think OSM is not for indoor maps. |
| 129581727 | almost 3 years ago | Oh, "Depot" matches the DEZ code better, I'll change that, thanks. I doubt there's a generator in the substation, but almost certain to be elsewhere for the control centre, same as Edmonds yard. |
| 129581727 | almost 3 years ago | Are you able to verify the Substation name/location? direction reversal point? and that Storage Lane 7-12 does not exist? |
| 129581727 | almost 3 years ago | Ah, thank you :) |
| 129581727 | almost 3 years ago | Hi, do you have a source for these track names, and VCC boundaries? |
| 128965941 | almost 3 years ago | Please do not connect minor lines if you are not verifying the actual electrical connections by survey or street-view imagery. Aerial imagery is not good enough. For example, way/1113501560
|
| 116003665 | over 3 years ago | |
| 116003665 | over 3 years ago | Are you sure this clock tower is 'the' Ladner clocktower? I thought the one in Trenant park sq was called that? |
| 120694320 | over 3 years ago | Hi are you adding power poles just because this is auto-tagged as a bug? Or is this data important to you? Either way, I would caution you that some nodes of a power line are not actually poles, but rather, overhead connections between lines. |
| 48852902 | almost 4 years ago | Hi, I untagged 1 way in this changeset as electrified, I'm assuming this was a mistake. |