trigpoint's Comments
| Changeset | When | Comment |
|---|---|---|
| 112370670 | about 4 years ago | |
| 112370670 | about 4 years ago | Hi
Cheers Phil |
| 112339206 | about 4 years ago | Thank you, you are correct. I will update those tags. |
| 112328871 | about 4 years ago | Hi
Thank you for your edits, they are very useful. You can put the route code into a prow_ref tag and add designation=public_footpath. One small problem, you do need to provide connectivity to the road, otherwise routers will see it as a dead end and not route over it. Here to help if you have any questions on OSM and rights of way. Cheers Phil |
| 111093296 | over 4 years ago | Hi John
At top level iD is rather clunky. I have restored the building, please could you check I have done it correctly? Cheers Phil |
| 86708812 | over 4 years ago | Hi, why would a way drawn through a car park that is already tagged as access=customers be private? Cheers Phil |
| 111077374 | over 4 years ago | Hi, welcome to OSM and thank you for your edits. NPE is a very strange choice of imagery to be using in 2021, it is only one inch to a mile and better out of copyright sources are available such as the 1:25k OS maps which include the field boundaries which are vital for mapping rights of way. In OSM we try to map the walked line, rather than the definitive line which tends for require a survey. The walked line is often different to the legal line. If using a 50+ year old map are you sure the path exists on the ground and has it been diverted or extinguished? If you have any questions please ask, either here or on the talk-gb mailing list. Cheers Phil |
| 111261018 | over 4 years ago | Hi
Cheers Phil |
| 110935022 | over 4 years ago | Strangely enough I drove this road this morning, and the signs were definitely green indicating in UK terms it is part of the primary road network. Not a motorway, but certainly the best and most important road in the area.
I am reverting this changeset. |
| 97124240 | over 4 years ago | Which is correct here?
|
| 109188600 | over 4 years ago | Hi, welcome to OSM and thank you for your edit. The level crossing nodes should be at the point where the road itersects with the railway. The road is however still tagged as construction so nothing will route over it. Your edit suggests that this is now open, is that the case? Cheers Phil |
| 108423488 | over 4 years ago | Hi, I am not sure that this edit makes much sense.
Cheers Phil |
| 84260418 | over 4 years ago | Hi
It doesn't appear to be closed. Cheers Phil |
| 107150501 | over 4 years ago | Thank you Freddy
Cheers Phil |
| 107150501 | over 4 years ago | Hi, welcome to OSM and thank you for your edits. However I am a little confused by this one, what source have you used as I have never seen a weight restriction sign for this bridge? Cheers Phil |
| 107316933 | over 4 years ago | Thank you. it just looks very odd that a co-op would be built with new houses so close and not to provide a sustainable route between them. |
| 107316933 | over 4 years ago | No even on foot? |
| 107316933 | over 4 years ago | You have also deleted part of Mirabelle Road, is there really no connectivity? |
| 106975483 | over 4 years ago | Reverted as requested. Sorry didn't see the later versions only the spam and verbal diarrhea. |
| 106908397 | over 4 years ago | Have fixed it |