-
Removed non-existing bench near old version of Ladestien.
Closed
-
Worked on correcting area around bus stop Clara Holsts veg. Not finished yet.
Closed
-
Footpaths upper end of Persaunvegen
Closed
-
Added shelter Persaunet Leir bus stop
Closed
-
Added explicitly platform to Bus stop Brian Smiths gate (similar as done in Dalen Hageby)
Closed
-
Added footway in lowest part of Persaunvegen
Closed
-
Pavements Persaunvegen
Closed
-
Added footpaths at Hesthagen according to actual usage and accessibility 2025-03. May change soon.
Closed
-
Added construction site in relation to Campusprosjekt P2.
Closed
-
Updated previous edit with a note.
Closed
-
Updated landuse in Gildheimsvegen / Travbaneveien; landuse of part changed from 2013, connections still represented pre-2013 state; follow-up from previous edit just changing use.
Closed
-
Set some addresses in Gildheimsvegen to correspond to future / under construction status from the status of demolished buildings which addr2osm import represents.
Closed
-
Added information / fixme on missing speedhumps in Persaunetvegen. This part needs to be checked again late summer 2025.
Closed
-
Added fixme to part of persaunvegen after road works late 2024.
Closed
-
Updated details around Coop Prix Persaunet, Plantasjen mainly to fix different issues.
Closed
-
Updated crossing Tyholtveien / Kong Øysteins veg. Rebuilt 2022/23 with separated lanes and pedestrian island.
Closed
-
Updated crossing outside Iskremfabrikken, mainly crossings.
Closed
-
Updated surface information on Marie Michelets veg.
Closed
-
Updated former petrol station near Saxenborg Gård after check.
Closed
-
Fixed issues around Tunga.
Closed