-
Continue Terracing South End buildings
Closed
-
Continue Terracing South End buildings
Closed
-
Continue Terracing South End buildings
Closed
-
Continue Terracing South End buildings
Closed
-
Continue Terracing South End buildings using simplified geometry from " MassGIS Data - Building Structures (2-D, from Ortho Imagery)"
Closed
-
Continue Terracing South End buildings using simplified geometry from " MassGIS Data - Building Structures (2-D, from Ortho Imagery)"
Closed
-
Continue Terracing South Boston buildings using simplified geometry from " MassGIS Data - Building Structures (2-D, from Ortho Imagery)"
Closed
-
Mark the Orange Lane/Commuter Rail areas as landuse=railway
Closed
-
Add more retaining walls along Orange Line; Join existing Southwest Corridor Park parts into a multipolygon
Closed
-
Add Sepia and hotel construction site; move Ink Block to an area as it spans multiple buildings.
Closed
-
Update Ink Block info, specify parking restriction
Closed
-
Add Ink Block
Closed
-
Add more retaining walls along Orange Line
Closed
-
Resolve SAM/Tax Parcel conflicts
Closed
-
Add sidewalks/stop signs
Closed
-
Switch to Southwest Corridor Park multipoligon; Add the McBride-Arborway area.
Closed
-
Add grass area @ Everett St
Closed
-
Add grass field on top of Orange Line tunnel
Closed
-
Orange Line Retaining Wall
Closed
-
James's Gate property sold to residential developer
Closed