1. Cleveland Street Construction. Construction underway, but lane reduction to two lanes is mostly in place as of 5/23.https://www.tampa.gov/document/cleveland-street-rr-crossing-w-n-willow-ave-s-parker-st-final-plans-122851

    Closed
    #151817540 1 7 0 0
  2. update turn restrictions

    Closed
    #151247448 5 4 0 0
  3. update surface type based on aerial and map note

    Closed
    #151231961 0 1 0 0
  4. set sidewalk as separate

    Closed
    #151231335 0 1 0 0
  5. set sidewalk as separate

    Closed
    #151231290 0 14 0 0
  6. set sidewalk as separate

    Closed
    #151231207 0 19 0 0
  7. mark as separate sidewalk

    Closed
    #151231019 0 1 0 0
  8. mark as separate sidewalk

    Closed
    #151230972 0 1 0 0
  9. fix number of lanes on Cass Street

    Closed
    #151230139 0 1 0 0
  10. twoway

    Closed
    #151230066 0 1 0 0
  11. GasWorx Construction; https://www.tampa.gov/road-closure/temporary-road-closures-channelside-dr-e-4th-ave-e-3rd-ave-e-2nd-ave-n-avenida

    Closed
    #151230033 16 21 0 0
  12. finetune location

    Closed
    #151229292 5 10 0 0
  13. twoway

    Closed
    #151229173 0 8 4 0
  14. set sidewalk as separate

    Closed
    #151229064 0 6 0 0
  15. update nebraska

    Closed
    #151228907 0 1 0 0
  16. meridian greenway cleanup

    Closed
    #151228731 0 4 3 0
  17. two way

    Closed
    #151228654 0 3 2 0
  18. merge features

    Closed
    #151228597 0 1 1 0
  19. two way

    Closed
    #151228543 0 24 0 0
  20. update sidewalks

    Closed
    #151228103 8 10 1 0