-
Cleveland Street Construction. Construction underway, but lane reduction to two lanes is mostly in place as of 5/23.https://www.tampa.gov/document/cleveland-street-rr-crossing-w-n-willow-ave-s-parker-st-final-plans-122851
Closed
-
update turn restrictions
Closed
-
update surface type based on aerial and map note
Closed
-
set sidewalk as separate
Closed
-
set sidewalk as separate
Closed
-
set sidewalk as separate
Closed
-
mark as separate sidewalk
Closed
-
mark as separate sidewalk
Closed
-
fix number of lanes on Cass Street
Closed
-
twoway
Closed
-
GasWorx Construction; https://www.tampa.gov/road-closure/temporary-road-closures-channelside-dr-e-4th-ave-e-3rd-ave-e-2nd-ave-n-avenida
Closed
-
finetune location
Closed
-
twoway
Closed
-
set sidewalk as separate
Closed
-
update nebraska
Closed
-
meridian greenway cleanup
Closed
-
two way
Closed
-
merge features
Closed
-
two way
Closed
-
update sidewalks
Closed