2nd step of several fixing up a construction area with completed construction.
1st step of several fixing up a construction area with completed construction.
Joined two segments of the same street.
Updated path alignments after survey
Updated path alignments after adding a missing one
Updating road and path attributes based on observation, GPX trace and latest aerial photos
Updating road and path attributes based on observation, GPX trace and latest aerial photos
Updating road and path attributes based on observation, GPX trace and latest aerial photos
Updating road and path attributes based on observation, GPX trace and latest aerial photos
Updating road and path attributes based on observation, GPX trace and latest aerial photos
Updating road and path attributes based on observation, GPX trace and latest aerial photos
Updating road and path attributes based on observation, GPX trace and latest aerial photos
Added additional tags for proposed feature
added proposed tag to clarify that the proposal is for a cycleway
Added approximate location of bike path I observed
Fixed some stop signs and added uncontrolled intersections.
Updating road and path attributes based on observation, GPX trace and latest aerial photos