-
improve poi for chancellor hotel
Closed
-
GGT 101 SB relation reorder; sequencing south from rohnert park
Closed
-
GGT 101 SB relation reorder; sequencing south from rohnert park
Closed
-
GGT 101 SB relation reorder; sequencing south from rohnert park
Closed
-
GGT 101 SB relation reorder; sequencing south from north edge of rohnert park
Closed
-
GGT 101 SB relation reorder; sequencing south from north edge of rohnert park
Closed
-
GGT 101 SB relation reorder; sequencing south from santa rosa
Closed
-
GGT 101 SB relation reorder; SF stops moved into place, other gradual reordering
Closed
-
GGT SB 130 relation reorder, start
Closed
-
improve restoration hardware poi
Closed
-
document drive-thru bofa ATM
Closed
-
shift 'housename' content to note
Closed
-
in dogpatch, document third rail bar, disuse dogpatch cafe, and fix zip code on another poi that wasn't checked
Closed
-
hours for hard knox cage / harmonic brewing in dogpatch
Closed
-
added 3rd/marin stops to IB/OB 15-third; added stop ids from sfmta website
Closed
-
remove curbside 47-only van ness stops, which should run in center brt lanes if 47 is ever restored
Closed
-
removes south vn/mission stop, which was moved and paved over by van ness brt
Closed
-
per survey, relocates evans/cesar chavez stop of NB muni 19 to intersection with marin st; marks fedex, public storage locations as checked
Closed
-
GGT 101 SB relation reorder; move VN/sacramento, VN/sutter stops into place, other gradual ordering improvement
Closed
-
GGT 101 SB relation reorder; move VN/vallejo, VN/jackson stops into place, other gradual ordering improvement
Closed