removed old ncn tags and removed bridge from NCN
removed old section of NCN (1)
modified surface which is now more suitable for cycles
added new section of route 50 and modified (1) following cycle survey
Large extension well underway so building shape modified
Added Proposed 150 The Naze extension due for delivery April 2016
Outline agreement to delivery 150 extension/link to The Naze for delivery April 2016
Route number not displayed correctly so added as two relations.
Adding cycle link between NCN1 and regional 50
Added additional section of Regional Cycle Route 50
Following sustrans ride added further section of Route 50
based on cycle survey added new cycleway and moved route 50 from road to cycleway.
connected to church hill from local knowledge
After a site visit we corrected the signs on this junction now that NCN1 has moved.