paceban532's Notes
Notes submitted or commented on by paceban532
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 4132269 | Inkle | Gate via StreetComplete 56.1 |
|||
| 3845951 | rich257 | Barrier - gate with 1.5m bypass via StreetComplete 53.3 |
|||
| 4133102 | ivanbranco | do really ferries pass through a culvert?
|
|||
| 2772416 | AbeOrch | Unable to answer "What surface does this path have here?" for way/787322058 via StreetComplete 31.3: currently access is blocked off Attached photo(s):
|
|||
| 2324500 | V12345678910 | One way road:
|
|||
| 1002488 | Harry Wood | Massive new lower level entrance area now open (although with some boarded up areas still) New shops, cash machines, toilets: https://flic.kr/p/TLoX1D https://flic.kr/p/TLoWU6 https://flic.kr/p/TLoWKZ difficult to arrange things accurately though. TODO: try to get photos to relate the entrance position to Fennington St |
|||
| 3356268 | The footpath at the end of Gallows Lane appears to have been blocked by landowners, effectively cutting off the circular route. |
||||
| 3033698 | Pink Duck | This car park becoming 3 hour limit with no return in 1 hour during 08:00–18:00, Monday to Saturday from 21st March 2022 as a 6-month trial. |
|||
| 3065596 | confusedbuffalo | Is this layby still open? |
|||
| 2674777 | Robert Whittaker | A new roundabout planned for this junction according to https://www.facebook.com/BreckCouncil/posts/3846782528764286 . Construction work is due to start in June 2021, and take about 14 weeks. Check back later to map the new road layout. #surveyme |