-
Added sidewalks along East 18th street and specified sidewalks on road way
Closed
-
Added roadway embankment
Closed
-
Added passenger loading zone on 24th Ave next to Nanaimo station & residential permit only parking on north side.
Closed
-
specified highway=platform areas
Closed
-
Closed gap in BC Parkway walking relation
Closed
-
Added pedestrian areas to better illustrate transit exchange at Nanaimo Station and improved some footpath connectivity.
Closed
-
Added existing slough
Closed
-
Updated a fast_food and a vacant shop
Closed
-
Updated a fast_food
Closed
-
Specified dual supply and return pipes along one way for District Energy pipes. Added additional hot water pipes
Closed
-
Updated names and added relations for branches of the China Creek Combined trunk sewer. Added usage tag to sewer.
Closed
-
Added additional branch to Hastings Sanitary Trunk Sewer. Added route relations for other branches previously added.
Closed
-
Added Marine Drive branch of Angus Drive combined sewer. Added separate route for overflow pipe
Closed
-
Added Manitoba Street combined Sewer
Closed
-
Added Copley Sanitary Trunk routes & details
Closed
-
Added reference acronyms to Borden St Combined Sewer
Closed
-
Added South Hill Combined Trunk Sewer
Closed
-
Added substance and usage tags missed to sewer relation missed in initial changeset
Closed
-
Added Borden St Combined Sewer
Closed
-
Updated building footprint. Added access to building
Closed