Added sections of GVWD water main
Added fencelines and top of highway embankment
Added sections of GVWD water main
Added turning lanes at 66 Ave & 200 Street
Reverted roadway mistagged as pedestrian crossing
Added sidewalk along Allan Road
Replaced parking lot point with area. Adjusted building footprint.
Added parking lot & parking aisles. Adjusted building footprints
Added sidewalks along Ross Rd. Added bridged section over creeks
Added traffic signals to Ross Rd & Mountain Hwy intersection & adjusted crosswalk alignment
Added traffic signal to cycle path
Added building, parking lot & specified parking aisle. Adjusted adjacent road alignment.
Added sidewalk along Library lane
Added turning lanes on Conifer St. Updated adjacent sidewalk traces Specified stop signs.
Combined ways with the same tags
Removed non-existent cycle path. Specified route goes through school service road + path
Specified parking aisle, added parking lot. Specified one-way road