-
Added foot paths. Adjusted building footprints
Closed
-
Added driveways for gas station
Closed
-
Added directions for speed humps in lane
Closed
-
Changed path tagging (not a dedicated cycleway)
Closed
-
Updated building footprint to match aerial imagery
Closed
-
Created 4 restaurants, 2 hairdresser shops, and 7 other objects; Confirmed 3 cafes, a restaurant, and 2 other objects
Closed
-
Added parkade entrance
Closed
-
Added public foot path
Closed
-
Corrected landuse extent for CD-1 (636)
Closed
-
Added loading dock node
Closed
-
Revised No-Frills building footprint. Added delivery access.
Closed
-
Revised Broadway alignment intersection/lane configurations to match existing conditions due to Mount Pleasant Station construction.
Closed
-
Brownfield is now a construction site; demolition/clearing works currently in progress
Closed
-
Changed designation from cycleway to path for MUP.
Closed
-
Changed designation from cycleway to path for MUP. Updated surface type.
Closed
-
Added new sidewalk and protected bike lane currently under construction
Closed
-
Created 3 bicycle_parkings and a tree; Deleted a bicycle_rental
Closed
-
Earles Street between Vanness Ave & E38th Ave have been removed from the cycling network
Closed
-
Updated path designations
Closed
-
Surveyed seaside greenway reroute. Temporary "protected" cycleway was found on Quebec & Switchmen street demarcated with traffic cones but it seems like they might be adding barriers in the future. Switchmen street has been converted into oneway
Closed