Improve steps and railings to West of Beaverton Central District Garage
Add railings & set sidewalks over Beaverton Creek as bridges near Crescent & Hall
Add additional details of crossings around the Round
Improved tags on Round Garage parking entrance
Complete sidewalks on Cedar Hills between Hall and Jenkins
Clarify sidewalk tags on streets off Farmington/BH Hwy
Clarify sidewalk tags on Beaverton Hillsdale Hwy
Clarify sidewalks tags on Griffith Park & 5th
Clarify sidewalks tags on Canyon/TV-Highway
Clarify sidewalks tags off Farmington
Clarify sidewalk tags down Farmington from Murray to Lombard
Improve details of pedestrian entrance near Powell's to distinguish steps & ramp
Improve details of pedestrian entrance near Panera across parking aisles towards Ulta & Powell's
Add separate sidewalks/crossings on entrance road into Cedar Hills Mall
Add separate sidewalks/crossings down Cedar Hills Mall between Hall and Fairfield
Added Cedar Hills & Fairfield pedestrian crossing & sidewalk into Cedar Hills Mall
Add segment of separate sidewalk down Cedar Hills from Hall to Westgate
Add separate sidewalks down Millikan between Rose Biggi and Cedar Hills
Add separate sidewalks around BG Plaza (Thayer, Rose Biggi, Westgate)