-
dodanie ścieżki
Closed
-
Data otwarcia jest szacowanym terminem ukończenia budowy. Droga będzie realizowana na podstawie umowy pomiędzy urzędem miasta a deweloperem, numer umowy 11/WID/2019.
Closed
-
drogi
Closed
-
Specify whether crosswalks have tactile paving
Closed
-
Specify roof shapes
Closed
-
Specify whether steps have handrails
Closed
-
Specify building and roof levels
Closed
-
Specify whether ways are lit
Closed
-
Specify whether steps have a ramp
Closed
-
Specify building types
Closed
-
Specify roof shapes
Closed
-
Add roof shapes
Closed
-
Add whether there are sidewalks
Closed
-
Add whether way is lit
Closed
-
Add tactile pavings on crosswalks
Closed
-
Add whether pedestrian crossing has an island
Closed
-
Add crossing type
Closed
-
Add path surfaces
Closed
-
Add tactile paving on kerbs
Closed
-
Add kerb height info
Closed