kevjs1982's Notes
Notes submitted or commented on by kevjs1982
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 822962 | albjorgui | I believe that the path does not connect with the road. Needs to be confirmed |
|||
| 1516017 | New build development here. Bellaway Homes, nearly all of the houses have been built along summer drive and autumn close. |
||||
| 1717402 | kevjs1982 | The (successful) Transforming Cities bid indicates that work to improve the pinch points and some links to the Beeston Canal cycle path will be completed by December 2019, including lighting under some bridges. Will need to survey once complete. |
|||
| 1710402 | kevjs1982 | Is this still an ambulance station? Not seen any NHS vehicles for some time, and no sign of NHS signage either. |
|||
| 1714958 | kevjs1982 | Is this a memorial garden? A number of trees with plaques on poles in front of them are located around here... |
|||
| 1674732 | Path being widened into verge, looks like pedestrain and cycle separation is being removed or changed to - need to update onxe the works complete |
||||
| 1697145 | Bollard, no kink until bridge |
||||
| 1676156 | kevjs1982 | Cycle signpost is in both directions - need to check to see if any of the planned widening works ever happened, and which way the cycle route goes towards Radcliffe Road. |
|||
| 1697114 | Desire path no longer evideny |
||||
| 777589 | West Bridgfordians Cricket Club |