-
Adds Lane Cove Tunnel and Falcon St E-ramp gantry references and operator
Closed
-
Adds Eastern Distributor gantry references and operator
Closed
-
Adds Cross City Tunnel gantry references and operator
Closed
-
Adds M2 gantry references
Closed
-
Adds missing NCX-M2 interchange toll gantries and gantry references
Closed
-
Adds detail to Sonny Leonard Street
Closed
-
Victoria Rd Access Rd now in use, convert existing left turn onto Victoria Rd as under construction.
Closed
-
Adds new toll tags to NorthConnex
Closed
-
Adds relation for Northconnex and opening date
Closed
-
Update alignment of NorthConnex
Closed
-
Update alignment of NorthConnex, fix connections with some surface nodes
Closed
-
Adds toll gantries for NorthConnex
Closed
-
Sonny Leonard Street now open, pedestrian sidewalk along Paul St (west side) is now also accessible
Closed
-
Fix typo Green Square - Ashmore connector, and realign construction area for Gunyama Park Aquatic Centre
Closed
-
Added lift entrance to Green Square station via Crown Building and surrounding walkways. Added elevator on west entrance and underground walkways.
Closed
-
Adds missing footpaths around Kingsborough Way
Closed
-
Updating Zetland Ave mid and west (construction commencement) and splitting Portman Street (south) between Geddes Ave and Sonny Leonard St in preparation of one-way operation
Closed
-
Buildings in Glenfield
Closed
-
Realign Leppington Stabling Yard
Closed
-
Buildings in Kensington
Closed