OpenStreetMap logo OpenStreetMap

jtracey's Notes

Notes submitted or commented on by jtracey

Id Creator Description Created at Last changed
690710 lgoldman

I believe the segment of the new BART tracks between Walnut Avenue and Stevenson Boulevard has flipped above-ground and below-ground markings.

In fact, that section of track is above ground at the station, crosses a new bridge over Walnut Avenue, then descends into a new tunnel under Stevenson Boulevard, continuing under Lake Elizabeth in Fremont Central Park.

491496 jtracey

The construction is (mostly) finished, and Capitol Ave now extends all the way to Fremont Blvd. It has a center divide, so it needs two one-way highways, as well as two intersections for the parking lots. No satellite yet, so GPS is probably needed.

1042126

This pathway (and bridge) have been permanently removed for the future LRT station.

891025

connecting path way/186942857 to service road way/131828036 would help routing

unless there's a fence in the way now?

1028650

Road way/28062271 possibly now named "William Tutte Way" - press release https://uwaterloo.ca/daily-bulletin/2017-05-12#mathematics-renaming-service-road-for-bill-tutte - could see if it's actually signed in real life and add if so

824324 Jarek 🚲

Has King Street through Uptown Waterloo not reopened yet? News was it was supposed to reopen to traffic on Nov 30 (http://www.therecord.com/news-story/6996212-uptown-waterloo-breathes-sigh-of-relief-as-major-lrt-work-wraps-up/), still showing as under construction on Dec 21

575352 andrewpmk

s road closed due to lrt w no hgv

301071 fbax

Erb Street - East or West?

Other streets near here use King Street as dividing line; but this section is "Erb Street East" and is West of King Street.

559612

yo thx 4 intrntet

465035 ruthmaben

Does 'Ridgeview Terrace' end here and does not connect 'Huntington Circle'?