jtracey's Notes
Notes submitted or commented on by jtracey
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 690710 | lgoldman | I believe the segment of the new BART tracks between Walnut Avenue and Stevenson Boulevard has flipped above-ground and below-ground markings. In fact, that section of track is above ground at the station, crosses a new bridge over Walnut Avenue, then descends into a new tunnel under Stevenson Boulevard, continuing under Lake Elizabeth in Fremont Central Park. |
|||
| 491496 | jtracey | The construction is (mostly) finished, and Capitol Ave now extends all the way to Fremont Blvd. It has a center divide, so it needs two one-way highways, as well as two intersections for the parking lots. No satellite yet, so GPS is probably needed. |
|||
| 1042126 | This pathway (and bridge) have been permanently removed for the future LRT station. |
||||
| 891025 | connecting path way/186942857 to service road way/131828036 would help routing unless there's a fence in the way now? |
||||
| 1028650 | Road way/28062271 possibly now named "William Tutte Way" - press release https://uwaterloo.ca/daily-bulletin/2017-05-12#mathematics-renaming-service-road-for-bill-tutte - could see if it's actually signed in real life and add if so |
||||
| 824324 | Jarek 🚲 | Has King Street through Uptown Waterloo not reopened yet? News was it was supposed to reopen to traffic on Nov 30 (http://www.therecord.com/news-story/6996212-uptown-waterloo-breathes-sigh-of-relief-as-major-lrt-work-wraps-up/), still showing as under construction on Dec 21 |
|||
| 575352 | andrewpmk | s road closed due to lrt w no hgv |
|||
| 301071 | fbax | Erb Street - East or West? Other streets near here use King Street as dividing line; but this section is "Erb Street East" and is West of King Street. |
|||
| 559612 | yo thx 4 intrntet |
||||
| 465035 | ruthmaben | Does 'Ridgeview Terrace' end here and does not connect 'Huntington Circle'? |