jmapb's Notes
Notes submitted or commented on by jmapb
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 2244626 | jmapb | survey to check name and access of this road |
|||
| 1889651 | jmapb | Based on aerial imagery I connected the two sections of the Lenape Ridge Trail here (previously they both terminated on the railroad.) Please verify to make sure this is correct. |
|||
| 4033118 | jmapb | survey for Harana Market https://www.haranamarket.com |
|||
| 2244632 | jmapb | Survey to see how far this track goes before it presumably becomes private toward Mountain Road |
|||
| 2699173 | jmapb | Is there a path here along the Trausneck Place right-of-way connecting Douglas Ave to Chase Ave? |
|||
| 2850946 | jmapb | Are there paths/steps connecting this island of High Street with the portion to the west, and with Nepperhan Avenue to the east? |
|||
| 4076321 | jmapb | Building here is signed "Salvin Design 3D Sound, Lighting, Video, & Effects" with website https://www.salvin.biz which lists the address as "308B Route 28
Meanwhile Ulster County GIS (https://ulstercountyny.gov/maps/parcel-viewer/?mapX=-8242992.043507991&mapY=5155062.3659916865&zoom=16&basemap=UCParcels&swis=515400&sbl=04800900010271100000) doesn't list any addresses for this plot. The currently mapped addresses 296 and 304 came from the NY State address import. Clarify when possible. Also, the sign's pretty old and the website still uses Flash, so this business might not be a going concern. |
|||
| 2843744 | jmapb | Survey to confirm street name -- map says Snyder but imported addresses say Schneider |
|||
| 1902726 | jmapb | According to the NYNJTC Long Path Guide the length of the SRT from the Hawthorne Lake parking lot to the intersection with the Long Path should be 2.7 miles. The current mapped trail length is about 2.5 miles. Survey for any discrepancies in geography. |
|||
| 1902682 | jmapb | According to https://www.nynjtc.org/book/G1-High-Point-State-Park-NJ-Hathorn-Lake-Greenville-NY the length of the SRT from the bench on the west side of Cedar Swamp to Greenville Turnpike should be 2.5 miles. The current mapped trail length is about 2.3 miles. Survey for any discrepancies in geography. |