-
Survey on foot
Closed
-
Survey on foot
Closed
-
Survey on foot
Closed
-
Survey on foot and bike. Took path widths with iPhone measure app (LiDAR), checked presence or removal of QMS panels. Open to alternate tagging schemes for usable width of footpaths (ie. the largest usable width excluding obstacles).
Closed
-
This QMS advertising panel has been demolished and there is no trace left - the first example I’m aware of! The footpath is now standard bluestone paving.
Closed
-
Mark traffic signals with countdown pedestrian timer
Closed
-
Add access tags for rozelle parklands features. See recent TfNSW media releases; sections will open in stages (but are currently all closed)
Closed
-
Survey on foot
Closed
-
Survey on foot and bike. Add bicycle=yes to sidewalks where there is no “end shared path” sign (until the nearest road, as per http://classic.austlii.edu.au/au/legis/nsw/consol_reg/rr2014104/s242.html)
Closed
-
Add number of features and realign some paths in Roselle Parklands. Used custom imagery captured by drone, aligned to NSW LPI imagery. Did not use control points, so likely not perfect.
Closed
-
Add details on foot
Closed
-
Fix maxspeed to match nearby segments (changed May 2018)
Closed
-
Fix incorrect use of marked crossing
Closed
-
Add surface=unpaved to homestead track
Closed
-
Add surface=unpaved to MTB cycleway
Closed
-
Add surface=unpaved to MTB cycleway
Closed
-
Add surface=unpaved to MTB cycleway
Closed
-
Add surface=unpaved to MTB cycleways
Closed
-
Add surface=unpaved to MTB cycleways
Closed
-
Add surface=unpaved to MTB cycleway
Closed