-
Pond was drained as dam was not earthquake compliant resulting in significant reduction of pond surface area. In addition out-stream flow from pond was redirected along east side of Harbour Hill Dr. The indicated bridge on Gardom Pond Lane is an earthen d
Closed
-
Add housenumbers
Closed
-
Add building and roof levels
Closed
-
Add building types
Closed
-
Add speed limits
Closed
-
Add whether way is lit
Closed
-
Add road surfaces
Closed
-
Add whether there are cycleways
Closed
-
Add building and roof levels
Closed
-
Add whether there is a parking fee
Closed
-
Add whether way is lit
Closed
-
Add path surfaces
Closed
-
Determine road names and types
Closed
-
Add type of parking access
Closed
-
Add speed limits
Closed
-
Add building types
Closed
-
Add orchard produces
Closed
-
Add bicycle parkings cover
Closed
-
Add bicycle parking capacities
Closed
-
Add baby changing table
Closed