1. Added bridge name (bridge has this name since 2022)

    Closed
    #155628394 0 1 0 0
  2. Add information about closed bridge due to reconstruction. Period is unknown but will be 4 - 6 months.

    Closed
    #150391296 0 1 0 0
  3. Naam van de brug gewijzigd, naambordje staat tegenwoordig op de brug. Besluit is in december 2023 genomen door gemeenteraad Amsterdam.

    Closed
    #150025211 0 1 0 3