-
Added bridge name (bridge has this name since 2022)
Closed
-
Add information about closed bridge due to reconstruction. Period is unknown but will be 4 - 6 months.
Closed
-
Naam van de brug gewijzigd, naambordje staat tegenwoordig op de brug. Besluit is in december 2023 genomen door gemeenteraad Amsterdam.
Closed