-
fix ramp
Closed
-
fix the bridge project, the SB former lanes are permanently gone. removed them to better connect new NB exit ramp
Closed
-
major closures in this area, need to redraw once work is all done and everything is rebuilt. some ramps are never coming back
Closed
-
add more class IV protected cycle way, transitions to class II bike lanes
Closed
-
this section is parking, bollard and even wall protected. This makes it a Class IV cycleway
Closed
-
This section is bollard, parking and bus stop protected, making it a Class IV cycleway
Closed
-
cycle path connection
Closed
-
driveway is closed
Closed
-
better cycleway entrances
Closed
-
cycleway crossings
Closed
-
fixing one way sections
Closed
-
The road overall contins a Class IV bikeway but the current design creates imroper routing. It tells a cyclist to make turns at signal and to exit the lane simply because the design changed. Drawing to a consistent Class IV
Closed
-
route adjustments
Closed
-
missing old road
Closed
-
add missing trails, roads
Closed
-
driveways
Closed
-
driveways
Closed
-
there's sign saying no public access
Closed
-
extend trail
Closed
-
road realignment
Closed