crossings have pedestrian signals
sidewalks on Chestnut St, they stop half way down
more sidewalk updates, align crossings with imagery better, upgrade tags
more POIs along Chestnut/Medford
new building outline for 2 Garden St
POIs and buildings on west side of Mystic
residential area includes tower
landuse areas east of Mystic + crossings
sidewalk along Mystic Street (east side)
sidewalk along Mystic Street (west side), connect some other footpaths
adjust paths and field area to match imagery
retail area and plumber's shop
commercial and industrial areas + add Valvoline
residential area between Winslow Towers and Police Station
tweak footpaths and gardens on Sunrise