eerib's Notes
Notes submitted or commented on by eerib
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 4747293 | eerib | According to a statement at the Regional Parks Committee Meeting May 7 2025, the 7 cabins in this area are currently being demolished with 1 cabin left. This is apart of new construction works to open a new portion of the park in this area. A survey is needed to verify cabin demolition, any trail changes, and any construction works. |
|||
| 4750251 | eerib | This boat launch area has been redeveloped and requires a re-survey once re-opened. Image of final design:
|
|||
| 4703205 | eerib | Survey potential trail at the end of the switchback that may connect over to Mount Sheer Main |
|||
| 4764532 | eerib | New dog off-leash area and associated features in this park to survey. |
|||
| 4750732 | eerib | Verify if there is actually a wetland on a school playing field. |
|||
| 4655000 | eerib | The extension of the "Bowen Island MUP" to Charlies Lane is anticipated to be completed by March 31, 2025. A survey of this area is needed and should also take care to note changes to the Trans Island Pathway. Multiple GPS recordings will be needed to get good accuracy as this is a steep ravine. Reference: https://bowenislandmunicipality.ca/our-government/capital-projects/multi-use-path-project/ |
|||
| 4696340 | Ladybird Recreation Site |
||||
| 4703202 | eerib | Survey trail that branches off of the road here. |
|||
| 4712484 | eerib | Locate the "Pillar of Payan" rock climbing crag. Note that the GPS point on MountainProject is likely inaccurate. More info: https://www.mountainproject.com/area/106240408/the-pillar-of-payan https://www.ukclimbing.com/logbook/crags/murrin_park-2303/#pillar_of_payan https://sendage.com/area/pillar-of-payan-valley-of-shaddai-bc-canada |
|||
| 4654995 | eerib | A report in the Bowen Island Municipality Monday, February 24, 2025 council meeting says this trail is now open. A re-survey of this trail is needed to verify if this is correct. "Recently, from 2023-2024, Metro Vancouver carried out work to complete trail access to Dorman
|