-
Detailing around Christian Cove/Pitt Lake
Closed
-
Combine adjacent wood areas
Closed
-
Improve detail of the Farrer Cove area
Closed
-
Add road name, split hydro road at park boundary and add accesss=private beyond
Closed
-
Split wood boundary around road, improve road accuracy
Closed
-
Belcarra/Sasamat Lake (add trails on Sasamat Hill and over to Camp Howdy, add/improve waterways, add/correct road/trail names, add waste bins, etc.)
Closed
-
Port Moody (split residential areas, add traffic signs, improve road alignment, detail Barber Street Park, etc.)
Closed
-
Switch from pier to bridge area
Closed
-
Inlet Park and Shoreline Trail (update post-construction of phase 2 of the boardwalk construction, start cleaning up poor and overlapping natural/landuse mapping, add POI's, etc.)
Closed
-
Adjust wood/residential landuse
Closed
-
Improve coastline, Improve forest outline, etc.
Closed
-
Indian River area (split wood boundary around roads, add waterways and culverts, improve road accuracy, add post boxes, etc.)
Closed
-
Split wood boundary around Indian River Drive, add culverts, improve nearby road/trail accuracy
Closed
-
Remove access=no on trails Air Supply, Air Supply Skid Road, and Pink Starfish. No signs, obstructions, or remediation witnessed over multiple surveys. Public continues to use the trails.
Closed
-
Switch name to alt_name and add more common name "Sideshow" as the main trail/feature name.
Closed
-
Indian River area (improve waterway accuracy, add culverts and bridges, improve road accuracy, etc.)
Closed
-
Seymour trail updates (add new trails, add bridges, add culverts, add/improve waterway accuracy, add street signs, etc.)
Closed
-
Add two bike parking
Closed
-
Add construction node for Big Way Hot Pot at King George Hub
Closed
-
Split retail landuse to not overlap road and the arts centre, add speed hump, update a few features to match the new development post bike lane addition
Closed