found better description of building type. From building to water tank
PSE is currently replacing these Wood H Frame structures with Metal pole structures.
Added flood control device to pond
Beaver pond. Size has increased.
Clipped extra path. Routed path as it is in the woods
Barbershop occupies the basement floor. A decor store just opened on the main floor.
Barbershop occupies the basement floor. A decor store just opened on the main floor.
There are new pickleball nets set up
Valvoline replaced Jiffy Lube. Blue Ginger building was demolished.