-
Convert Warm Springs Subdivision track that is the main route for both ACE from usage=branch to usage=main.
Closed
-
Convert Niles Subdivision track that is the main route for both ACE and Capitol Corridor from usage=branch to usage=main.
Closed
-
Add some swimming pools visible on aerial imagery.
Closed
-
Add some swimming pools visible on aerial imagery.
Closed
-
This supermarket is now an H-Mart (and has been for at least a year or so, likely a bit longer).
Closed
-
convert multipolygon that no longer has an inner back to having tags on the way
Closed
-
Remove inner from multipolygon relation that should really no longer exist (but rawedit no longer works for me).
Closed
-
Add building part with 7 levels, now that I've confirmed the level count by walking outside and looking at the building.
Closed
-
This still requires more fixup, but tag the courtyard as a building part since the courtyard is actually on the first floor, and this part of the building therefore has 1 floor.
Closed
-
Tag main entrance to Novotel hotel.
Closed
-
tag as bridge=yes
Closed
-
Map under-construction cycleway based on observations of the construction crossing 101 and on the Initial Study documents at http://www.ci.east-palo-alto.ca.us/index.aspx?NID=182
Closed
-
Guess primary as a classification based on existing airport's roads.
Closed
-
Add what appears to be an under-construction roadway based on 2018-04-25 Sentinel-2 image, although it appears it's likely both a motorway *and* a railway, so requires more detail.
Closed
-
Add what appears to be an under-construction roadway based on 2018-04-25 Sentinel-2 image, although it appears it's likely both a motorway *and* a railway, so requires more detail.
Closed
-
Add under-construction roadway based on 2018-04-25 Sentinel-2 image.
Closed
-
Update under-construction runways based on 2018-04-25 Sentinel-2 image.
Closed
-
Revert mass deletion by Couridecs around Beijing Xijiao Airport, China, by reverting most of changeset 58085923 (except 3 building creations).
Closed
-
Better align route of under-construction railway with construction visible on 2018-04-08 Sentinel-2 imagery.
Closed
-
Map under-construction highways, visible on 2018-04-08 Sentinel-2 imagery.
Closed