-
Survey if places still exist
Closed
-
Specify road surfaces
Closed
-
Determine roads lane count
Closed
-
Determine roads lane count
Closed
-
Specify path surfaces
Closed
-
Determine roads lane count
Closed
-
Determine roads lane count
Closed
-
Specify wheelchair accessibility of toilets
Closed
-
Specify toilet fees
Closed
-
Specify drinking water types
Closed
-
Specify path surfaces
Closed
-
Survey if places still exist
Closed
-
Specify road surfaces
Closed
-
Specify whether traffic signals have sound signals
Closed
-
Specify path surfaces
Closed
-
Specify road surfaces
Closed
-
Update output of Kursk NPP - units 1 and 2 have been shut down so only 3 and 4 remain in operation at this time: https://en.wikipedia.org/wiki/Kursk_Nuclear_Power_Plant as of 10 August 2024
Closed
-
Specify road surfaces
Closed
-
Update tebay car park and add underground power cables under m6
Closed
-
The Tesla Supercharger is referred to as Tebay Southbound. Also, it has now the v3 connectors, so it only has CCS Combo, no tesla-only plugs
Closed