Continue several paths for routing. Add crosswalks so sidewalks can be used.
Continue several paths for routing. Add crosswalks so sidewalks can be used.
Found path skipping switchbacks
Add vertical ramps (three segmenta, incline) connecting freeway bridge to ways on either side
continue sidewalk to crossing so it can be routed
Connect emergency trail by ways to the road for routing
Connect sidewalks to ways for routing
No way to get from Timothy Court to Alameda del Prado
Remove duplicate edges at the bridge
Connect path to road for routing
Add footpaths E of Target. Move bench to where imagery with proper offset shows.
Surveyed trails in pacheco valley
Expand paths N of Alameda del Prado
Add footpaths around Pacheco Ville