-
Small mods to path line new gpx and bing also some hedgerows mapped
Closed
-
straighten A14 lanes
Closed
-
(no comment)
Closed
-
added note to present end of new bridle way.
Closed
-
Added barrier to almost complete bridleway
Closed
-
added fence survey
Closed
-
lionk added as tempory fix untill last section of track is built.i think it could take some time survey and gpx
Closed
-
road alignment to DG
Closed
-
added section of unknown but private at the moment road will be bridleway opening soon
Closed
-
(no comment)
Closed
-
mods to new Bridleway walked ith gps
Closed
-
small details rushden lakes source visit and DG
Closed
-
paths and polygon survey and DG
Closed
-
Added steps to ends of footbridge, and cotswold and decatlon shops plu coofee shop at bus stop
Closed
-
added bridge and level tags to rushden lakes foot bridge
Closed
-
minor node edits to repolfile new tracks
Closed
-
re shaped some residentail road drew a some buildings bing
Closed
-
Added barrier hedgerow
Closed
-
slight mods to bridle way and clcle path under construction or nearly c done but closed , should open 12 dec 2019
Closed
-
small mode for hedges and footpaths survey gpx and bing
Closed