Adding new separated bike lanes, existing crosswalks, existing sidewalks.
Adding new separated bike lanes, existing crosswalks, existing sidewalks.
Placed bus stops at current locations.
Replaced buildings at hondar house
Added restricted turn movements, modified cycle path alightments.
Moved bus stops - changed on 8.21.2023
Added Ellis school ground and features.
Relocated bus stop to correct location.
Added sidewalks + modified bus stop location.
Added vent shaft for MBTA Red Line
Modified curbs/signals. Added parking road.
Removed abandandoned railways that no longer have significant evidence of their existence
Named parking lot to be Buena Vista lot.