andrepoiy's Notes
Notes submitted or commented on by andrepoiy
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 5086327 | andrepoiy | New signals and divided road here. Need to update when imagery updates. |
|||
| 2372810 | andrepoiy | Road will be divided here after installation of centre median. Source: |
|||
| 2359329 | andrepoiy | Unlike YRT, TTC doesn't appear to publish any maps of its bus terminals, nor do they number their bus platforms, so it is a bit hard to know the exact location of the bus stops. Therefore, what's here is an approximation until someone surveys it in person. |
|||
| 3310413 | andrepoiy | There should be a centre median extension (from Hwy 11 to Graham) to be finished sometime in the near future - keep an eye out for when that's done and change it here |
|||
| 2395833 | andrepoiy | 404 widening (adding HOV) from 407 to Major Mack. Estimated completion 2022 |
|||
| 1953937 | andrepoiy | Aren't these roads all highway=track? |
|||
| 2432915 | andrepoiy | Needs underground survey for Don Mills bus terminal. Found a map on TTC website but it doesn't really show where the bus entrance/exits are, so it's a bit hard to draw anything on the map. http://www.ttc.ca/images/Stations/Routes_at_Station/don_mills.png |
|||
| 3894035 | andrepoiy | Need to realign crosswalks and intersection geometry for York Downs/Bur Oak, Vanderbergh/Wilfred, and New Yorkton/Beckett once satellite imagery updates. I currently roughed in some crosswalks but they are very likely not in their actual spots. |
|||
| 2465136 | andrepoiy | Leslie Street widening from Broughton Lane to Don Hillock Drive complete, awaiting satellite imagery to update. |
|||
| 2167301 | andrepoiy | GO Station improvements here. The construction is planned to be done by 2022. Rutherford Road and the railway will be grade separated, a parking garage will be added, among other things. As of right now, Rutherford is temporarily realigned, but it hasn't shown up on satellite imagery yet. |