-
Removed dirt walkway that no longer exists
Closed
-
Add path from service road into Tai Wan. Add new gate at residential construction area by power station beach, and alternate dirt path.
Closed
-
Updates to steps and footpaths
Closed
-
Adjusted path above Lo Tik Wan based on two GPS traces, added stair counts and spur path up to graveyard.
Closed
-
Added stair counts and a few more buildings and addresses. Completed back foot path.
Closed
-
Refined stairs and buildings around Sha Po New Village. Squared up building outlines, promoted address nodes to house polygons on Kam Shan Terrace.
Closed
-
Add buildings and footpaths to Sha Po New Village based on field survey
Closed
-
Tags changed to match upstream ways leading into the parking lot. This lot is a one-way loop which can only be entered through the modified way. Without this change it is possible to exit but not to enter the lot in a car.
Closed
-
Added romanized name to Higanji
Closed
-
Added amagoi no taki waterfall node (in Kamiyama)
Closed
-
Added informal path, merged and tagged private driveway with gate. Changes based on walking survey after incorrect routing results.
Closed
-
Ensure routing connectivity of McMasterville station to local street network.
Closed
-
Add transit center platforms and crosswalks for routing based on diagrams from Centro website.
Closed
-
Add library in Ubud
Closed
-
Topology: Make park and ride share nodes with aisles and walkways to improve routing.
Closed
-
Topology: share nodes between platforms, parking lots, and neighboring roads for routing purposes.
Closed
-
Topology: share nodes between platforms, parking lots, and neighboring roads for routing purposes.
Closed
-
Topology: Make park and ride share nodes with aisles and walkways to improve routing.
Closed
-
added singapore hackerspace
Closed
-
Connected micro-mapped transit center to street with sidewalk tags, ensure routing connectivity.
Closed