-
Neubau einer Fußgängerbrücke, Eröffnung schätze ich auf Anfang 2025. Pfeiler stehen teils schon.
Closed
-
Hausumringe An der Osterbek
Closed
-
Specify whether parking requires a fee
Closed
-
Determine the heights of kerbs at crossings
Closed
-
Specify whether crosswalks have tactile paving
Closed
-
Specify whether pedestrian crossings have markings
Closed
-
Specify path surfaces
Closed
-
Specify road surfaces
Closed
-
Specify maximum physical heights
Closed
-
Spielplatz nahe Försterweg; note 3495209
Closed
-
Specify whether public transport stops have shelters
Closed
-
Specify street/place names to addresses
Closed
-
Survey housenumbers
Closed
-
Specify maximum physical heights
Closed
-
Survey if places still exist
Closed
-
Specify cycle barrier types
Closed
-
Specify step counts
Closed
-
Survey tactile paving on steps
Closed
-
Specify whether steps have a ramp
Closed
-
Specify whether steps have handrails
Closed