-
+new cycle ramp
Closed
-
+new one-way direction in via Petrolini
Closed
-
+tramway construction works
Closed
-
+tram crossings
Closed
-
+sidewalks around Casalecchio Garibaldi
Closed
-
+sett
Closed
-
+update Terminal Michelino
Closed
-
+update Terminal Michelino
Closed
-
+via San Pio V no longer connected to eastward lane in via Saffi
Closed
-
+tramway construction works; interbinario 3,0 m
Closed
-
+new stop sign in via del Vivaio
Closed
-
+fix line 93
Closed
-
+interbinario (3,00 m)
Closed
-
+tramway construction works
Closed
-
+buildings in tram depot
Closed
-
+traffic_calming
Closed
-
+traffic_calming
Closed
-
Survey whether places have vegetarian food
Closed
-
Add whether public transport stops are lit
Closed
-
Specify whether pedestrian crossings have islands
Closed