-
Repositioned the marked pedestrian crossing. Needed to detatch the original traffic signal from the connecting point of roads at the roundabout
Closed
-
Added bicycle rack, barriers, footpath (unsure if it is also a cycle path - will need to go check again)
Closed
-
Added a bicycle slipway of the main route as well as a fence barrier
Closed
-
added a grit bin
Closed
-
Added traffic signals at the new junction with Palmerston Place and North Esplanade West - including a no right turn relation. Unsure how to do exact placement.
Closed
-
Update road layout and added junction with Palmerston Place and North Esplanade
Closed
-
Indicated that the cycleway is somewhat compressed onto the sidewalk under the bridge
Closed
-
Added a final section of the new segregated cycle and footpath on South College street. A few more small edits will be necessary. but I think the main route from the station to the river is now more or less complete
Closed
-
Add signalled pedestrian crossing on South College Street
Closed
-
Continued to add new segregated two-way cycle path and footway down South College street.
Closed
-
Disconnected Bank Street from South College Street and changed the service road to connect to Bank street (it is really only a turning area, I think)
Closed
-
Repositioned bench, and removed a grit bin that no longer exists.
Closed
-
Continued to add new segregated two-way cycle path and footway down South College street.
Closed
-
I disconnected portland Street from South College street following a survey. There is a bicycle and pedestrian connection now. This section needs more surveying and more detail. I'll try to go back to do this.
Closed
-
Changed fencing and boundary of the Clayhills Substation. Based on survey of new cycle path and road layout.
Closed
-
Started to add segregated cycle way (2 directional) and footpath. Need to complete, but first need to sort out the fence around the power station.
Closed
-
Joined cycle way up with the crossing - indicated that it is on a sidewalk.
Closed
-
Added crossing for cycles and pedestrians
Closed
-
Extended traffic island
Closed
-
Refining cycling and footpaths in the area derived from signage (shared use signage on the east of College street - no real signage on the west - although one set of traffic lights has shared use indicators
Closed